14
www.vintageair.com
905644 REV A 01/10/19, PG 14 OF 33
Fresh Air Cap &
Kick Panel Cover Preparation
1.
2.
Install (4) large grommets and a 7/8” grommet into the fresh air cap (See Photos 1 and 2, below).
Install (4) large grommets and a 7/8” grommet into the kick panel cover (See Photos 3 and 4, below).
Photo 1
Photo 2
Photo 3
Photo 4
Heater and A/C Hose Installation
NOTE: Soapy water may be used to ease insertion of A/C and heater hoses through the grommets, but
be sure the hoses are capped to prevent water from getting inside.
Photo 1
1.
On the inside of the fresh air cap, the letter “T” indicates the top mounting hole for the firewall (See Photo 1,
below).
(4) Large
Grommets
33137-VUI
Fresh Air Cap
622230
Kick Panel Cover
622235
“T” Indicates
Top Mounting Hole
Completed Installation
Completed
Installation
7/8” Grommet
33144-VUI
(4) Large
Grommets
33137-VUI
7/8” Grommet
33144-VUI
Содержание 564191
Страница 33: ......