8
SW24.T
15
-
Complete M1 closure
Leaf M1 continues until it reaches the closed mechanical stop
16
-
Open leaf M1
Leaf M1 restarts opening at normal speed
17
51
Setting the offset for opening
Press 51 to set the opening offset time
18
Completion of opening
M2 starts at normal speed and both leaves open fully
19
-
Close leaf M2
Leaf M2 restarts closing at normal speed
20
51
Setting the offset for closing
Press 51 to set the closing offset time
21
-
Complete closure
M1 starts at normal speed and both leaves close fully
22
-
End of procedure
The PRG LED turns off. End of procedure
Note:
With this type of programming, the mechanical stops are necessary both when closing during programming and in normal operation. The steps with
a grey background are for a double-leaf installation, and are not carried out for a single-leaf installation.
Fast calibration, gear motor without encoder (DIP 10 = ON)
(slows down at 30% of its travel, opening offset of 3 s, closing offset of 6 s)
No. Pressing
push button Phase
Description
1
PROG
Procedure activation
Press the programming push-button PROG for at least 3 seconds, until the PRG LED starts flash
-
ing slowly, and then release it
2
51
Close leaf M2
Press push-button 51:
M2 closes at normal speed up to the closed mechanical stop
3
-
Close leaf M1
M1 closes at normal speed up to the closed mechanical stop
4
-
Open leaf M1
M1 opens at normal speed until it reaches the open mechanical stop
5
-
Open leaf M2
M2 opens at normal speed until it reaches the open mechanical stop
6
-
Close leaf M2
M2 closes at normal speed up to the closed mechanical stop
7
-
Close leaf M1
M1 closes at normal speed up to the closed mechanical stop
8
-
Complete cycle
The gate performs a complete opening and closing cycle with the default slow-down distance and
offsets
9
-
End of procedure
The PRG LED turns off. End of procedure
Note:
With this type of programming, the mechanical stops are necessary both when opening and closing, during programming and in normal operation.
The steps with a grey background are for a double-leaf installation, and are not carried out for a single-leaf installation.
Advanced calibration, gear motor without encoder (DIP 10 = ON)
(slow-down and offsets programmed by the installer)
No. Pressing
push button Phase
Description
1
PROG
Procedure activation
Press the programming push-button PROG and hold it down; the PRG LED will start flashing
slowly; keep PROG pressed until the PRG LED flashes fast, and then release it
2
51
Close leaf M2
Press push-button 51:
M2 closes at normal speed up to the closed mechanical stop
3
-
Close leaf M1
M1 closes at normal speed up to the closed mechanical stop
4
-
Open leaf M1
M1 opens at normal speed
5
51
Set the slow-down point when
opening M1
Press 51 to set the slow-down start point when opening leaf M1
6
-
Complete M1 opening
Leaf M1 continues to the closed mechanical stop
7
-
Open leaf M2
M2 opens at normal speed
8
51
Set the slow-down point when
opening M2
Press 51 to set the slow-down start point when opening leaf M2
9
-
Complete M2 opening
Leaf M2 continues to the closed mechanical stop
10
-
Close leaf M2
M2 closes at normal speed
11
51
Set the slow-down point when
closing M2
Press 51 to set the slow-down start point when closing leaf M2
12
-
Complete M2 closure
Leaf M2 continues until it reaches the closed mechanical stop
13
-
Close leaf M1
M1 closes at normal speed
14
51
Set the slow-down point when
closing M1
Press 51 to set the slow-down start point when closing leaf M1
15
-
Complete M1 closure
Leaf M1 continues until it reaches the closed mechanical stop
16
-
Open leaf M1
Leaf M1 restarts opening at normal speed
17
51
Setting the offset for opening
Press 51 to set the opening offset time
18
Completion of opening
M2 starts at normal speed and both leaves open fully
19
-
Close leaf M2
Leaf M2 restarts closing at normal speed
20
51
Setting the offset for closing
Press 51 to set the closing offset time
21
-
Complete closure
M1 starts at normal speed and both leaves close fully
22
-
End of procedure
The PRG LED turns off. End of procedure
Note:
With this type of programming, the mechanical stops are necessary both when opening and closing, during programming and in normal operation.
The steps with a grey background are for a double-leaf installation, and are not carried out for a single-leaf installation.
EN