manualshive.com logo in svg
background image

2

11" dia.

hole

20½"

11" dia.

hole

1"

Ø

Ø

9

11

/

16

"

20½"

Ø

Ø

18"

12

5

/

8

"

18"

12

11

/

16

"

1¼" dia. hole

1¼" dia. hole

Roof Rafter

Roof   Rafter

Roof Rafter

REMOVE SHINGLES

REMOVE SHINGLES

Roof   Rafter

Guide hole

(centered

between rafters)

Guide hole

(centered

between rafters)

12

11

/

16

"

21"

11" dia.

hole

22"

Guide hole

(centered between studs)

25"

29½"

29½"

14

11

/

16

"

11

13

/

16

"

14

5

8

"

17"

W

all Stud

W

all Stud

11" dia.

hole

20"

1¼" dia. hole

1¼" dia. hole

3"

Ø

Ø

Ø

Ø

REMOVE

SIDING

REMOVE

SIDING

Guide hole

(centered between studs)

1. Choose a position on the outside wall. Make sure that no

wall studs, pipes or wires run through the opening area.

2. From inside, mark and drill a 

guide hole

 centered

between 

wall studs

.

PREPARE THE INSTALLATION
LOCATION

ROOF INSTALLATIONS

25"

2"

7"

29-1/2"

2"

WALL INSTALLATIONS

1. Locate the blower on the rear slope of the roof. Place it

in a location to minimize duct run. The location should
be free of obstacles (T.V. leads, electrical lines, etc.). If
the blower top is level with the roof peak, it will not be
seen from the street. Keep this approximate location in
mind as you work from within the attic.

2. Mark and drill a 

guide hole

 centered between 

roof

rafters

.

3. From the outside, use the guide hole as a starting point

to lay out the installation:
A. Use a T-square to measure 12

5

/

8

" to the left of the

guide hole, then up 12

11

/

16

" to locate the top-left

corner of the layout.

B. Starting from the top-left corner, mark the rectangu-

lar cutout (21" W x 20½" H) and remove only the
shingles in this area.

C. Mark an 

11" diameter hole

 centered on the guide

hole. Cut this hole through the roof board(s).

D. Mark and cut a 

1¼" diameter hole

 through the roof

board(s) where shown.

4. For flat roof installations, build a curb that will mount the

blower at a minimum pitch of 2/12. Discharge end of the
blower should be pointed away from prevailing winds.

PREPARE THE INSTALLATION
LOCATION

3. From the outside, use the guide hole as a starting point

to lay out the installation:
A. Use a T-square to measure 14

5

/

8

" to the left of the

guide hole, then up 14

11

/

16

" to locate the top-left

corner of the layout.

B. Starting from the top-left corner, mark the rectangu-

lar cutout (25" W x 29½" H) and remove only the
siding in this area.

C. Mark an 

11" diameter hole

 centered on the guide

hole. Cut this hole through the roof board(s).

D. Mark and cut a 

1¼" diameter hole

 through the roof

board(s) where shown.

Содержание VEV1500

Страница 1: ...ringdamageandnoisyand orunbalanced impellers keepdrywallspray constructiondust etc offpower unit 3 Please read specification label on product for further informa tion and requirements 4 Electrical circuit including speed control if used must be rated6AMPSminimum Blower Dimensions 25 x 30 828 x 12 724 PLAN THE INSTALLATION 1 Locate the blower so the length of the duct run and numberofelbowsneeded a...

Страница 2: ...ic 2 Mark and drill a guide hole centered between roof rafters 3 From the outside use the guide hole as a starting point to lay out the installation A Use a T square to measure 125 8 to the left of the guide hole then up 1211 16 to locate the top left corner of the layout B Starting from the top left corner mark the rectangu lar cutout 21 W x 20 H and remove only the shingles in this area C Mark a...

Страница 3: ...per opens and closes freely 1 Place a large bead of caulk on the back side of the housing all along the outer edges 2 Center the blower ring in the 11 diameter hole making sure that the 1 diameter electrical wiring hole aligns with the hole in the wiring box 3 Attach blower to the wall with the six 6 screws pro vided It is recommended that the screws be located inside the blower housing Drill pilo...

Страница 4: ...ate connectors VIKING RANGE CORPORATION GREENWOOD MISSISSIPPI 38930 USA 4 Wire black to black white to white and green or bare wire beneath green ground screw Replace wiring box cover 5 Attach rough in plate to the studs at the inside top of hood with 4 10 24 nuts provided 6 Connect ductwork to rough in plate and tape joint 7 Turn on power and check blower operation INSTALL THE ROUGH IN PLATE USE ...

Страница 5: ...er les pales ou de les rendre bruyantes débar rassez l appareil de la poussière de plâtre de construc tion etc 3 Veuillez lire l étiquette de spécifications du produit pour obtenir plus de renseignements notamment sur les nor mes 4 Le circuit électrique y compris la commande de régime le cas échéant doit avoir au minimum une puissance nomi nale de 6 ampères Dimensions de ventilateur 55 9 cm 22 x 7...

Страница 6: ...galité avec le faîte du toit il ne sera pas visible de la rue Rappelez vous la position approzimativeduventilateurlorsquevoustravaillerezà l intérieur du grenier 2 Marquez et percez un avant trou centré entre les chevrons du toit INSTALLATIONS SUR LE TOIT PRÉPARATION DE L INSTALLATION PRÉPARATION DE L INSTALLATION 3 Del extérieur utilisezl avant troucommepointdedépart pour tracer le plan d install...

Страница 7: ...1 po 3 2 cm de diamètre pour le câble électrique est aligné avec celui de la boîte de câblage 3 Fixez le ventilateur au mur avec les six 6 vis fournies Il est conseillé que les vis soient posées à l intérieur du boîtier Au besoin percez des avant trous 4 À l aide d un mastic de bonne qualité étanchez les têtes de vis d assemblage 5 Enfilez un câble électrique dans le trou de la boîte de câblage et...

Страница 8: ...38930 USA POSE DE LA PLAQUE DE RACCOR DEMENT UTILISATION ET ENTRETIEN Débranchez l alimentation électrique et verrouillez le pan neau d entrée d électricité avant de nettoyer ou de réparer l appareil NETTOYAGE Retirez le couvercle et passez soigneusement l aspirateur à l intérieur du boîtier Veillez à ne pas courber ou endom mager la roue du ventilateur LUBRIFICATION DU MOTEUR Le moteur est lubrif...

Отзывы: