VZ-WM60
Installation Instructions
Visit the ViewZ website at http://www.viewzusa.com
Page 7
Concrete Surface Installation
Step 6. With the help of an assistant, place a
level on the center of the mounting rail
and level the mount. Mark and drill the
second mounting hole.
Step 7. Insert one (1) 5/16” x 3” lag bolt and
washer into the mounting hole and
tighten (see WARNING: Page 4).
Repeat for the remaining mounting
points.
Level
Do NOT overtighten lag bolts when
attaching the mount to the wall. Improper
installation may result in personal injury or
damage to property.
Step 1. Place the wall plate into position against the
wall, keeping it level.
Step 2. Mark off four holes to be used for securing the
mount and place the wall plate aside.
Solid Surfac
e
Cin
der Bl
ock
Step 3. Next, drill holes using an electric drill
and masonry bit. The drill bit size that is used
will depend on the size of the hardware used.
Step 4. Insert a concrete anchor into each hole.
Step 5. Use a hammer to lightly tap each anchor into
place so that they are flush with the wall.
Mark
Drill
Concrete anchors are not supplied. Please use commercially available hardware. Follow the installation instructions as
provided with the hardware.
You must secure the wall plate with a
minimum of four (4) lag bolts (2 for each
stud found).