5
• Refer to the recommendation of the brand of epoxy
you are using and predrill the correct sized holes for
these
1
/
2
" threaded studs
• Apply concrete epoxy in to the holes
• Insert the threaded studs into each hole
• Thread the
1
/
2
" x 8" hex head bolts into place, so they
are finger tight
• Predrill through the header plate holes with a
3
/
8
" drill bit
• At this point, predrill all your header plate holes using
a
1
/
2
" bit
• If not level left to right, shim the header plate to adjust
• If not level front to back, shim the footer plate to adjust
• Cut the excess shim away
14
13
Straight Stringer Installation Steps (Continued)
15
b
15
a
© 2021 VIEWRAIL All Rights Reserved · (866) 261-8013 · viewrail.com · For Helpful Tutorials go to www.youtube.com/viewrail