7
4.
Fill the heating system with water and
vent until the fill pressure indicated at
pressure gauge
A
is 0.1 to 0.2 bar
higher than the pre-charge pressure
of the diaphragm expansion vessel.
Minimum system pressure 0.8 bar;
permissible operating pressure
3 bar.
5.
Return the check valves to their oper-
ating position.
Checking the gas type
Note
The boiler is preset in the factory for nat-
ural gas E.
1.
Check the gas type and Wobbe index
with your gas supply utility or your
LPG supplier and compare them with
the details on the burner label.
2.
If the details do not match, convert
the burner to the available gas type,
in accordance with the information
provided by the gas supply utility or
the LPG supplier.
Conversion kit installation
instructions
3.
Record the gas type in the report on
page 28.
Wobbe index ranges
Gas type
Wobbe index range Ws
kWh/m
3
MJ/m
3
Delivered condition
Natural gas E
12.0 to 16.1
43.2 to 58.0
After conversion
LPG P
20.3 to 21.3
72.9 to 76.8
Changing the gas type (if required)
Conversion kit installation
instructions
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5692 699 GB
Содержание VITOGAS 100-F
Страница 25: ...25 201 207 200 203 211 205 208 202 212 204 210 Parts lists Parts lists cont 5692 699 GB ...
Страница 26: ...26 209 206 107 001 004 005 002 007 006 009 Parts lists Parts lists cont 5692 699 GB ...
Страница 27: ...27 103 106 105 109 008 100 110 112 108 102 111 101 104 108 Parts lists Parts lists cont 5692 699 GB ...