6
Preparing for commissioning and filling the heating system
Fill water
!
Please note
Unsuitable fill water increases
the level of deposits and corro-
sion and may lead to boiler dam-
age.
■ Flush the heating system thor-
oughly before filling.
■ Only use fill water of potable
quality.
■ An antifreeze additive suitable
for heating systems can be
added to the fill water. The anti-
freeze manufacturer must ver-
ify its suitability.
■ Fill and top-up water with a
water hardness in excess of
the following values must be
softened, e.g. with a small soft-
ening system for heating water.
Total permissible hardness of the fill and top-up water
Total heating
output
Specific system volume
kW
< 20 l/kW
≥ 20 l/kW to
< 50 l/kW
≥ 50 l/kW
≤ 50
≤ 3.0 mol/m
3
(16.8 °dH)
≤ 2.0 mol/m
3
(11.2 °dH)
< 0.02 mol/m
3
(0.11 °dH)
> 50 to ≤ 200
≤ 2.0 mol/m
3
(11.2 °dH)
≤ 1.5 mol/m
3
(8.4 °dH)
< 0.02 mol/m
3
(0.11 °dH)
> 200 to ≤ 600
≤ 1.5 mol/m
3
(8.4 °dH)
≤ 0.02 mol/m
3
(0.11 °dH)
< 0.02 mol/m
3
(0.11 °dH)
> 600
< 0.02 mol/m
3
(0.11 °dH)
< 0.02 mol/m
3
(0.11 °dH)
< 0.02 mol/m
3
(0.11 °dH)
1.
Check that the installation room vent
is open.
2.
Check the pre-charge pressure of the
diaphragm expansion vessel.
If the pre-charge pressure of the dia-
phragm expansion vessel is lower
than the static system pressure, top
up with sufficient nitrogen to raise the
pre-charge pressure 0.1 to 0.2 bar
higher than the static system pres-
sure.
3.
Open the check valves (if installed).
Commissioning, inspection, maintenance
Further details regarding the individual steps
5692 699 GB
Содержание VITOGAS 100-F
Страница 25: ...25 201 207 200 203 211 205 208 202 212 204 210 Parts lists Parts lists cont 5692 699 GB ...
Страница 26: ...26 209 206 107 001 004 005 002 007 006 009 Parts lists Parts lists cont 5692 699 GB ...
Страница 27: ...27 103 106 105 109 008 100 110 112 108 102 111 101 104 108 Parts lists Parts lists cont 5692 699 GB ...