21
Initial start-up, inspection and maintenance
Further details regarding the individual steps
(cont.)
Checking the ionisation current
¨
ĂSafety instruction
Switch OFF the system ON/OFF switch on the control unit before connecting
the test equipment.
1.
Connect the test equipment acc. to
the diagram.
2.
Start up the boiler set to the higher
rated output:
Set emission test switchĂ"
S
" on
the control unit to "
h
".
The minimum ionisation current
should be at least 5Ă
m
A as soon as
the flame is established (approx.
2
Ă
Ć
Ă
3Ăseconds after opening the gas
combination valve).
3.
If the ionisation current is <Ă5Ă
m
A
H
check the electrode gap
(see pageĂ18);
H
check the control unit power
supply.
4.
Set the emissions test switch after
the test to "
a
".
5.
Record the actual value in the
service report.
5692Ă485
G
B
Содержание Vitodens 200
Страница 25: ...25 Initial start up inspection and maintenance 5692Ă485 GB ...
Страница 96: ...96 Control unit for weather compensated mode with Comfortrol prog unit 5692Ă485 GB ...
Страница 99: ...101 5692Ă485ĂGB ...
Страница 105: ...109 Appendix Maint service Maint service Maint service Maint service 5692Ă485ĂGB ...
Страница 107: ...111 Appendix Maint service Maint service Maint service Maint service 5692Ă485ĂGB ...
Страница 109: ...113 Appendix Maint service Maint service Maint service Maint service 5692Ă485ĂGB ...