61
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
•
•
•
3. Checking the refrigerant circuit for leaks
........................................................................ 62
•
4. Filling and venting the secondary side
............................................................................ 62
•
•
•
5. Checking the expansion vessel and heating circuit pressure
....................................... 63
•
•
6. Checking the indoor unit electrical connections for firm seating
•
•
•
7. Checking that the fan in the outdoor unit can run freely
............................................... 64
•
8. Cleaning the outdoor unit heat exchanger (evaporator)
................................................ 65
•
•
9. Checking the outdoor unit electrical connections for firm seating
............................... 65
•
•
•
•
•
•
11. Switching on the power supply
........................................................................................ 65
•
•
•
•
............................................................................................... 66
•
•
•
14. Checking the heat pump for noise
................................................................................... 77
•
•
•
15. Checking the system function
.......................................................................................... 77
•
16. Instructing the system user
.............................................................................................. 78
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
6150148