8
Checking outputs and actuators
Carrying out an actuator test
Note
An actuator test is only possible when the boiler is cold.
If the actuator test is carried out for one mixer, all other connected mixers remain in
standard operation. Following the actuator test, the tested mixer reverts to standard
operation after 3 minutes.
With respect to their application, the actuators are split into several categories:
■ Boiler actuators
■ Actuators for the corresponding mixer modules
Press the following keys:
1.
d
+ MENU simultaneously for
approx. 4 s.
The
"Service"
menu is
displayed.
2.
|
/
~
for
"Actuator test"
.
3.
d
to confirm.
4.
|
/
~
for the required actua-
tor category.
5.
d
to confirm.
6.
|
/
~
for the required actua-
tor or relay output.
Note
The actuator test is ter-
minated automatically
if no input is made for
5 min.
7.
d
to confirm.
8.
d
to terminate.
9.
Press
g
until the default display is
shown.
The actuator test has been termina-
ted.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5604 447 GB
Содержание KOB Pyromat ECO
Страница 42: ...42 230V connection Designs Connection and wiring diagram 5604 447 GB ...
Страница 43: ...43 LV connection Designs Connection and wiring diagram cont 5604 447 GB ...
Страница 46: ...46 Plug X1 Drawing assignment 1 6 1 2 3 4 5 6 7 X1 Designs 230 V plug cont 5604 447 GB ...
Страница 57: ...57 030 022 021 020 025 031 031 012 019 025 044 024 024 035 Parts lists Parts lists cont 5604 447 GB ...
Страница 58: ...58 008 004 001 002 032 043 037 038 007 007 007 009 002 005 Parts lists Parts lists cont 5604 447 GB ...
Страница 59: ...59 006 006 006 007 034 036 013 015 018 014 016 033 017 015 003 Parts lists Parts lists cont 5604 447 GB ...