89
Installation room...................................................10, 12
Instantaneous heating water heater.......................9, 57
Instructing system user.............................................. 62
Intended use................................................................ 8
Internal components
– Overview................................................................. 64
Isolators......................................................................45
K
KM-BUS..................................................................... 42
L
Lead appliance...........................................................20
LON communication module................................20, 44
– Slot.......................................................................... 42
LON module......................................................... 20, 44
LV lead routing........................................................... 30
M
Main PCB............................................................. 32, 33
Maintenance...............................................................52
MCBs/fuses, checking................................................66
Message and safety connections...............................39
Minimum clearances.................................................. 12
Minimum flow rate...................................................... 29
Minimum room volume...............................................12
Minimum system pressure......................................... 53
Mixer extension kit..................................................... 56
Modbus...................................................................... 42
Modbus distributor......................................................42
N
Ni 500.........................................................................65
Noise.................................................................... 49, 63
Non-return valves, opening........................................ 53
O
ON/OFF switch...........................................................54
On-site connections................................................... 15
Operating display adjustment.....................................62
Output increase............................................................9
Outside temperature sensor
– Curve.......................................................................65
Overview
– Hydraulic connections............................................. 26
– Internal components................................................64
– Pumps..................................................................... 64
– Sensors................................................................... 64
– Valves......................................................................64
P
Parameter group selection......................................... 55
Parameters
– Cooling function...................................................... 58
– Electric booster heater............................................ 57
– Energy meters.........................................................59
– External functions....................................................57
– External heat source............................................... 58
– For external extension.............................................57
– For heating circuit pump..........................................56
– For mixer extension kit............................................ 56
– For Vitocom 100......................................................57
– Ice store system...................................................... 59
– Instantaneous heating water heater........................57
– On-site components................................................ 56
– Other components...................................................56
– Photovoltaics...........................................................59
– Power generated on site......................................... 59
– Pumps..................................................................... 56
– Report..................................................................... 72
– Solar DHW heating................................................. 58
– Swimming pool water heating................................. 58
– Ventilation................................................................59
Parameter setting.......................................................55
Parameter settings
– For DHW heating.................................................... 22
Permiss. operating pressure...................................... 53
Photovoltaics..............................................................59
Power cable routing................................................... 30
Power generated on site............................................ 59
Power-OFF.................................................................47
Power supply..................................................10, 45, 47
Premium tariff meter...................................................47
Pressure checking......................................................53
Pressure transmitter
– High pressure..........................................................64
– Low pressure...........................................................64
Primary circuit, filling and venting...............................52
Primary circuit connection.......................................... 29
Programming unit installation.....................................49
Pt 500.........................................................................65
Pumps........................................................................ 64
PWM signal................................................................ 42
R
RCD........................................................................... 47
Refrigerant circuit, checking for leaks........................ 52
Repairs.......................................................................64
Repair work................................................................ 52
Reports.......................................................................72
– Control parameters................................................. 72
Request for commissioning........................................84
Required equipment.......................................17, 18, 21
Residual current device..............................................45
Resistance curves of sensors.................................... 65
Return temperature sensor........................................ 65
– Primary circuit......................................................... 65
– Secondary circuit.....................................................65
Ripple control receiver............................................... 47
Room height...............................................................12
Keyword index
Keyword index
(cont.)
5787 232 GB
Содержание BW 301.C090
Страница 91: ...91 5787 232 GB...