Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Opening the heat pump
..................................................................................................... 44
•
2. Compiling reports
.............................................................................................................. 44
•
3. Purging the refrigerant lines and the internal unit
.......................................................... 44
•
4. Checking tightness of the refrigerant lines
..................................................................... 44
•
5. Evacuating the refrigerant lines and internal unit
........................................................... 45
•
6. Charging the refrigerant lines and internal unit
.............................................................. 46
•
•
•
7. Checking the refrigerant circuit for tightness
................................................................. 47
•
8. Filling and venting the secondary side
............................................................................ 47
•
•
•
9. Checking expansion vessel and heating circuit pressure
............................................. 48
•
•
10. Checking electrical connections of the internal unit for firm seating
•
•
•
11. Checking the free running of the fan in the external unit
............................................... 49
•
12. Cleaning the external unit heat exchanger (evaporator)
................................................ 49
•
13. Checking thermal insulation of flared connections
•
•
14. Checking electrical connections of the external unit for firm seating
.......................... 50
•
•
•
15. Closing the heat pump
....................................................................................................... 50
•
•
•
16. Switch ON the power
......................................................................................................... 50
•
•
•
17. Starting the heat pump
...................................................................................................... 50
•
18. Commissioning the system
............................................................................................... 50
•
19. Ticking the heat pump type
............................................................................................... 59
•
•
•
20. Checking the heat pump for noise
................................................................................... 59
•
•
•
21. Checking the system function
.......................................................................................... 59
•
22. Instructing the system user
.............................................................................................. 59
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5700 542 GB
Содержание 7513685
Страница 61: ...61 4x 1 3 2 Fig 52 Maintenance Placing the control panel in its service position 5700 542 GB Maintenance...
Страница 80: ...80 Parts lists internal unit Hydraulics internal unit type AWB AC cont 5700 542 GB Components...
Страница 126: ...126 5700 542 GB...
Страница 127: ...127 5700 542 GB...