48
3.
Fill (flush) and vent the secondary circuit via an on-
site connection.
F
E
D
C
Fig. 45
Safety assembly supplied
C
Pressure gauge
D
Connection G
¾
E
Quick-action air vent valve
F
Safety valve
4.
Check the system pressure at pressure gauge
C
.
Top up with water if required.
Minimum system pressure:
0.8 bar (80 kPa)
Permiss. operating pressure:
3.0 bar (0.3 MPa)
5.
Move the control unit panel into the service posi-
tion: See page 61.
6.
Open the programming unit: See page 60.
A
B
Fig. 46
7.
To prevent damage to electrical components, con-
nect an on-site hose to secondary circuit air vent
valve
B
.
Open secondary circuit air vent valve
B
.
8.
Move 3-way diverter valve
A
by its handle into its
centre position.
9.
Close secondary circuit air vent valve
B
.
Checking expansion vessel and heating circuit pressure
Observe engineering information.
Heat pump technical guide
Commissioning, inspection, maintenance
Filling and venting the secondary side
(cont.)
5700 542 GB
Содержание 7513685
Страница 61: ...61 4x 1 3 2 Fig 52 Maintenance Placing the control panel in its service position 5700 542 GB Maintenance...
Страница 80: ...80 Parts lists internal unit Hydraulics internal unit type AWB AC cont 5700 542 GB Components...
Страница 126: ...126 5700 542 GB...
Страница 127: ...127 5700 542 GB...