14
C
Clearances for installation and maintenance:
≥
500 mm
D
Clearance (according to DIN 18101):
≥
944 mm
Note
When installing cascades (master/slave), observe the
respective minimum clearances in accordance with the
previous graphics.
Note
The electronic injection valve and the compressor wir-
ing chamber are located on the right-hand side.
Anti-vibration base
Site the heat pump on a base prepared on site for the
purpose of noise attenuation and even weight distribu-
tion.
Note
In the case of corner installation, enlarge the base by
the minimum clearances (see chapter "Minimum clear-
ances" on page 13).
150
Fig. 7
A
Concrete B25, iron
B
Floor construction, screed
C
Top edge unfinished floor
D
Impact sound insulation as per regulations
E
Pressure-tested sound insulation layer, approx.
10 to 20 mm
F
Heat pump
Pressure points of the heat pump feet
Types BW 302.DS090 and BW 302.DS110
168
1400
1064
1000
50
709
50
145,5
Fig. 8
ê
Pressure point, foot
E
Pressure-tested sound insulation layer, approx.
10 to 20 mm
F
Front of the heat pump
Preparing for installation
Transport and siting requirements: Heat pump
(cont.)
5837251
Installation