Adjust the construction height of the element in accordance with the
on-site marking of the upper edge of the finished floor.
n
X: 1000 mm
Tighten the feet of the element using a fork spanner.
ð
The element is attached to the wall.
9
Handling
Prevista Dry WC element with shower WC connection
13 from 27