3 Handling
3.1
Assembly information
3.1.1
Mounting conditions
n
Masonry walls
n
Concreted walls
n
Metal support profiles
n
Prevista Dry Plus pre-wall constructions
The wall constructions must comply with the regulations in section
„Regulations from section: Fields of application / Mounting condi‐
.
The WC element may only be mounted on even wall surfaces.
With the construction height, the marked height of the upper edge of
the finished floor must be observed.
The installation depth is maximum 200 mm.
The WC element can only be used in combination with wall-hung WCs
(fixing gauges for bore hole 180 mm or 230 mm).
The WC element has an R
½
inch water connection.
The WC element can be extended by a remote flush actuation or by an
electronic actuation, as well as by sensitive flush plates. The cables for
these electrical actuation versions must be laid in front of the cladding.
The corresponding empty pipe is required when preparing the remote
flush actuation.
Suitable walls
Construction height
Installation depth
WC ceramic
Water connection
Actuation versions
Handling
Prevista Dry WC element with shower WC connection
10 from 27