5. Commissioning
Once all connections have been made, the system wiring needs to be checked, the system needs to be powered up and the BMS
functionality needs to be checked. This is how to do this:
• Check polarity of all battery cables.
• Check cross sectional area of all battery cables.
• Check if all battery cable lugs have been crimped correctly.
• Check if all battery cable connections are tight (don’t exceed maximum torque).
• Tug slightly on each battery cable and see if the connections are tight.
• Check all BMS cable connections and make sure the connector screw rings are screwed all the way down.
• Connect with VictronConnect to each battery.
• Check if each battery has the most up to date firmware.
• Check if each battery has the same settings.
• Connect the system positive and negative DC cable to the battery (or battery bank).
• Check the string fuse(s) rating (if applicable).
• Place the string fuse(s) (if applicable).
• Check the main fuse rating.
• Place the main fuse.
• Check if all battery charge sources have been set to the correct charge settings.
• Turn on all battery chargers and all loads.
• Check if the BMS is powered up.
• Disconnect a random BMS cable and verify that the BMS is turning off all charge sources and all loads.
• Reconnect the BMS cable and check if all charge sources and loads turn back on.