
Chapter 4 - Operation
About This Chapter
This chapter details power on, power off and configuration of the KRX-3V5 Video Decoder. For full
programming and operation information, refer to the ViconNet Software manual, XX113-0X (where X is a
revision number between 0 and 9). The following sections provide information as follows:
Powering-On the Decoder
guides the user through proper power on and boot procedures.
Powering-Off the Decoder
guides the user through proper shut down procedures.
Configuring the Decoder
guides the user through network setup.
Powering-On the KRX-3V5
To power on the decoder:
1. Verify that the KRX-3V5 is set up as detailed in Chapter 3
, Installation.
2. Ensure that the 24 VAC power supply to the KRX-3V5 or connect PoE via network cable (RJ-45). The
Status Indicator will illuminate blue (blinking) to indicate the decoder is ON and running properly.
Powering-Off the KRX-3V5
To power off the decoder:
With the decoder operational, disconnect the 24 VAC power supply or, if using PoE, disconnect the
network cable (RJ-45). The power indicator will cease to illuminate, indicating a power OFF condition.
8
•
Chapter 4 - Operation
XX184-01-00 KRX-3 Video Decoder
Содержание KRX-3V5
Страница 2: ......
Страница 8: ...vi Table of Contents XX184 01 00 KRX 3 Video Decoder...
Страница 17: ...XX184 01 00 KRX 3 Video Decoder Chapter 4 Operation 9...
Страница 31: ......
Страница 38: ......