27
11
Warranty and responsibility for defects
After its filling-up, the "Certificate of boiler quality and completeness" serves as a "Warranty certificate".
In case of a reclaim of the cladding, the customer is obliged to present the package sheet of the boiler cladding. It is placed on the
cardboard box in which the cladding is transported.
The user is obliged to put a professional contractual service accredited by VIADRUS a.s., the
boiler manufacturer in trust with defects elimination, otherwise the boiler proper fu
nction isn’t guaranteed.
The user is obliged to perform boiler's regular maintenance.
Each announcement of faults has to be carried out immediately after their location always in a written form. and by phone agreement.
In case of violation of the mentioned instructions, the warranty provided by the manufacturer is not admitted.
The manufacturer reserves the right for a change performed within an innovation of the product, which doesn't need to be included in
this manual.
The manufacturer holds no responsibility for possible damages unless the product is being used in accordance with the conditions
specified in these service instructions.
The warranty doesn’t relate to:
-
defects caused by a wrong mounting and incorrect operation of the product and defects caused by incorrect maintenance
– see
chapter 8;
-
damage of the product during transportation or other mechanical damage;
-
defects caused by insufficient storage;
-
damage occurred as a result of non-observance of water quality in the heating system - see chapter 4.1 and 5.2.5,
or due to using
anti-freeze liquids;
-
defects occurred due to nonobservance of instructions specified in this manual;
-
defects caused by natural disaster or other unpredictable event.
12
Recommended procedure for mounting and putting into operation
(Instruction for mounting companies)
Only qualified company trained by the manufacturer may perform mounting and putting into operation.
1.
Select boiler power (size) depending thermal losses of the facility and project documentation.
2.
The boiler and flue channel have to be evaluate from the point of view of the level and economy of operation as one whole. By this reason,
before proper mounting, require a report of revision of the flue channel with the determined chimney draught.
3.
Observance of the required chimney draught is a base condition for the correct boiler operation.
A required draught of the chimney in
Pa for particular sizes of the boiler
boiler size
[Pa]
5 sections
18
6 sections
16
7 sections
18
8 sections
20
9 sections
20
4.
Depending on the boiler-room layout, select the boiler placement to enable comfortable servicing, cleaning and maintenance of the boiler.
5.
Carry out a check of the supply of a sufficient quantity of combustion air into the boiler room.
6.
Perform connection of the boiler to the heating system in accordance with the legal legislation and according to the approved project
documentation.
7.
Check performance of the connection of the fume-extraction system of the boiler to the smoke uptake.
-
due to low temperatures of flue gases, we recommend that you isolate the connection
-
It is better to perform connection directly (without other elbows)
-
we recommend elbows with cleaning holes
-
fulfillment of the proper connection of the fume-extraction system to the smoke uptake has to enable dilatation
Содержание HERCULES E68 5 A
Страница 35: ...35 15 Information specified on the name plate...