Table of content
page
1
Boiler usage and advantages ................................................................................................................................................................... 3
2
Technical parameters of the boiler HERCULES E68 ................................................................................................................................ 3
3
Description ............................................................................................................................................................................................... 5
3.1
Boiler structure ................................................................................................................................................................................... 5
3.2
Regulating and safety elements ......................................................................................................................................................... 5
3.3
Excessive heat exhausting device ..................................................................................................................................................... 6
3.4
Heat Removal Device - Accumulating Tanks...................................................................................................................................... 8
4
Positioning and installation ....................................................................................................................................................................... 8
4.1
Regulations and directives ................................................................................................................................................................. 8
4.2
Possibilities of placement ................................................................................................................................................................... 9
5
Delivery and assembly ........................................................................................................................................................................... 11
5.1
Delivery and accessories content ..................................................................................................................................................... 11
5.2
Mounting procedure ......................................................................................................................................................................... 12
5.2.1
Boiler drum installation............................................................................................................................................................... 12
5.2.1.1
Boiler drum installation
– DBV 1 - 02 two-way safety valve ............................................................................................... 12
5.2.1.2
Placement of the shaped pieces set, tertiary air nozzle and inclined grate for the boiler with a size of 6 to 9 sections
(Fig. No. 16) ..................................................................................................................................................................... 13
5.2.1.3
Placement of the shaped pieces set, tertiary air nozzle and inclined grate for the boiler with a size of 5 sections
(Fig. No. 19) ..................................................................................................................................................................... 14
5.2.2
Mounting of claddings and electric wiring ................................................................................................................................... 15
5.2.3
Setting of the boiler control unit .................................................................................................................................................. 17
5.2.3.1
Boiler power settings ........................................................................................................................................................ 17
5.2.3.2
Perform remaining setting according to the heating system and the boiler type. ............................................................... 17
5.2.4
Hydraulic scheme of the boiler ................................................................................................................................................... 18
5.2.5
Electric connection diagram ....................................................................................................................................................... 19
5.2.6
Mounting of the cleaning tool ..................................................................................................................................................... 21
5.2.7
Filling the heating system with water .......................................................................................................................................... 21
6
Commissioning - instructions for contractual service organizations ........................................................................................................ 22
6.1
Verification activities before commissioning ..................................................................................................................................... 22
6.2
Commissioning the boiler ................................................................................................................................................................. 22
7
Operating the boiler by user ................................................................................................................................................................... 22
7.1
Kindling ............................................................................................................................................................................................ 24
7.2
Operation ......................................................................................................................................................................................... 25
8
Maintenance .......................................................................................................................................................................................... 25
9
IMPORTANT WARNINGS ..................................................................................................................................................................... 26
10
Instructions for product liquidation after the lapse of its service life ......................................................................................................... 26
11
Warranty and responsibility for defects ................................................................................................................................................... 27
12
Recommended procedure for mounting and putting into operation (Instruction for mounting companies) .............................................. 27
13
Wrong methods of the connection of the boiler to the chimney ............................................................................................................... 29
14
Boiler information sheet .......................................................................................................................................................................... 30
15
Information specified on the name-plate ................................................................................................................................................. 35
16
Warranty certificate and certificate of quality and completeness for the VIADRUS boiler ........................................................................ 37
Содержание HERCULES E68 5 A
Страница 35: ...35 15 Information specified on the name plate...