FIRST COMMISSIONING
01. Before operating the machine, clean the machine thoroughly.
02. Please check whether the machine or electrical cables are damaged.
03. Have specialists check that you are allowed to operate the machine with the mains voltage and
that it is correctly connected.
04. Connect the machine to the compressed air system. The operating pressure at the filter valve is
6 bar. (See chapter 08.02. Pneumatic connection)
05. All covers must be mounted.
NOTE!
1.) Should deviations occur,
DO NOT
operate the machine!
2.) Only connect the machine to a grounded power outlet!
DECOMMISSIONING
01. Switch off the machine at the control.
02. Pull out the mains plug.
03. Disconnect the machine from the compressed air, if available.
04. Clean the machine if necessary.
05. If possible, cover the machine to avoid soiling.
TRANSPORT - PACKAGING - DISPOSAL - STORAGE
01.
Transport of the machine
All machines are delivered packed.
The product must be checked for shipping damage after delivery. For subsequent damage
within the customer‘s operation, the manufacturer assumes no liability.
Make sure that the products are transported safely and with the utmost care at your facility.
02.
Packaging
The packaging material must be disposed of in accordance with local environmental protection
regulations.
03.
Disposal
The customer is responsible for the proper disposal. Disposal should comply with local
environmental regulations.
NOTE!
Parts contaminated with lubricants or oils must be disposed of separately.
04.
Storage
When not in use for a long time, the machines must be protected against dirt, moisture and
corrosion (for example: by an oil film).
01. PREFACE
06.
TRANSPORT - PACKAGING - DISPOSAL - STORAGE
FIRST COMMISSIONING / DECOMMISSIONING
Содержание 5374
Страница 1: ...5374 SERVICE MANUAL 02 2021 ...
Страница 2: ......
Страница 3: ...5374 SERVICE MANUAL 02 2021 ...
Страница 8: ...06 02 2021 Vetron 5374 HotAir Welding ...
Страница 30: ...28 02 2021 Vetron 5374 HotAir Welding 03 COMMISSIONING WELDING ...
Страница 64: ...62 02 2021 Vetron 5374 HotAir Welding ...