F:\Manual\SM-1517R-110V-100514
14.05.2010.
- 11 -
4-4 Installation of machine
1. First fix an eye end screw on the top of Pillar.
2. Hook the chain on the eye end.
3. Attached the chain or steel cable on a fork lift.
Get five M5X25 screws ready from the tool box.
4. Rise the fork up around 2m high,
5. Slowly move back the fork lift until the Pillar
is up around 80 degree to the ground.
6.Push the Pillar until it is right up.
7. Use 5 M
12 ×
25 Socket head screws with
washers to tight up the Pillar on the base. Be
sure those 5 screws have been fastened securely.
Содержание SWA Series
Страница 40: ...F Manual SM 1517R 110V 100514 14 05 2010 37 I I rn a N a a J r o N o or o 2...
Страница 44: ...F Manual SM 1517R 110V 100514 14 05 2010 41 I ol 4 cl J f...
Страница 70: ...F Manual SM 1517R 110V 100514 14 05 2010 67 12 3 1 Fig 14000 Bottom Plate Diagram 1...
Страница 77: ...F Manual SM 1517R 110V 100514 14 05 2010 74 12 5 1 Fig 18100 Control Box Diagram 11 10 9 8 1 15 16 o 17...
Страница 85: ...F Manual SM 1517R 110V 100514 14 05 2010 82 12 7 1 Fig 19100 Pre Stretch Unit Diagram 7 2 1...