Installation of the machine
4-1 Setting the machine and choosing base
1.
The site for the machine should provide the conditions essential for precision installation,
2.
If the machine is placed on an upper floor, it shall ensure that the floor has adequate
strength for this machine.
3.
A clear area must be provided along the rear face of the machine in accordance with the
diagram forward in page 2 and it is essential for efficient maintenance and assembly.
4-2 Packing and Unpacking
1.
In general, the machine was packed with carton and pallet. The processes are as follows:
2.
Please refer to machine weight in page
2 to arrange handling equipment.
3.
Before unpacking always keep the mark
Ï
(or “up” arrow sign) upward and keep the
packing away from impact for preventing any damage on the machine.
4.
Remove top portion first. Then, remove the side portions.
5.
Do not damage any components inside the carton.
6.
About the packing procedures, please refer to the following illustration diagrams.
7.
The unpacking procedure is the reversal of packing.
1. Firstly, fix the side portion. Reserve the gap between the column and the side portion for
minimum 1 cm.
2. Fix the opposite side portion.
Содержание SWA Series
Страница 40: ...F Manual SM 1517R 110V 100514 14 05 2010 37 I I rn a N a a J r o N o or o 2...
Страница 44: ...F Manual SM 1517R 110V 100514 14 05 2010 41 I ol 4 cl J f...
Страница 70: ...F Manual SM 1517R 110V 100514 14 05 2010 67 12 3 1 Fig 14000 Bottom Plate Diagram 1...
Страница 77: ...F Manual SM 1517R 110V 100514 14 05 2010 74 12 5 1 Fig 18100 Control Box Diagram 11 10 9 8 1 15 16 o 17...
Страница 85: ...F Manual SM 1517R 110V 100514 14 05 2010 82 12 7 1 Fig 19100 Pre Stretch Unit Diagram 7 2 1...