
12) Component installation: Each builder has their own preference of how they like to install the various
components. Here are a few pictures of how I chose to install my equipment.
I am using a Hanson 4 ounce UAT, a Smart Fly Voltage regulator, Swiwin ECU and the landing gear controller. I
have 3 batteries on board. The ECU battery is a Turnigy 3s LiPo and the Receiver batteries are Turnigy 2s LiPo. I
use the receiver batteries to power the landing gear controller at 6v by running a simple Y connector from the
regulator.
Содержание Turbinator-2
Страница 7: ...Zero Flap Full Flap 2 inches from bottom of fuse ...
Страница 9: ...Main Gear installed with 3mm blind nuts Leads modified with servo connectors ...
Страница 13: ...Nose Steering linkage ...
Страница 15: ...Aluminum Heat Tape installed on engine bay cover ...
Страница 17: ......