![Vesco Turbinator-2 Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/vesco/turbinator-2/turbinator-2_build-manual_1008759012.webp)
Sanding the pins with 80 grit paper to allow for a smooth fit.
Once you are satisfied with the fit, grind a flat spot onto the 6mm rods where the screw contacts it.
This is an important step. DO NOT SKIP THIS STEP. This will help maintain the security of the wing in flight.
You do not have to crank down hard on the screws when assembling the wing for flight. Just snug pressure is
enough to hold it.
10) Nose gear installation: We used 3mm blind nuts and screws to attach the nose gear. Once you’ve
completed this step you can install the steering servo and linkage. You do not need full throw for the steering,
In fact you’ll only need about 40 percent of your travel at the maximum.
3mm blind nut
Содержание Turbinator-2
Страница 7: ...Zero Flap Full Flap 2 inches from bottom of fuse ...
Страница 9: ...Main Gear installed with 3mm blind nuts Leads modified with servo connectors ...
Страница 13: ...Nose Steering linkage ...
Страница 15: ...Aluminum Heat Tape installed on engine bay cover ...
Страница 17: ......