background image

5

ORIGINAL INSTRUCTIONS

VES Andover Ltd Eagle Close Chandlers Ford Ind. Est. Eastleigh Hampshire SO53 4NF
Tel: 023 8046 1150  Fax: 023 8026 1204  E-mail: [email protected] Web: www.ves.co.uk

    EVH Hybrid Ventilation Unit

Installation, Operation and Maintenance Manual

Continued

Duct transitions and plenum boxes allow for resizing and/or realignment as required and
should be sized to match both unit and louvre connections. A pair of joining brackets per
section (one each side) are provided to assist with the duct connection.
The example shown in fig.        below depicts a two-part transition/plenum, each section having
its own set of joining brackets.

Fix the bracket parts to both sides of unit and transition as shown using the M6 fixings
provided. Tape the joint using self-adhesive rubber tape prior to assembly to prevent air
leakage.
To finish the assembly, bring the sections together and install the M8 joint fixings through both
parts of each joining bracket and tighten using a 6mm hex key, drawing the sections together
evenly, ensuring no visible gaps.

The nut is loose but held within the bracket body. Take care not to dislodge when fixing.

Installation

4

Caution

Flange connections and channels are 

NOT 

structural and are included as part of the unit

sealing only. When moving assembled units ensure that 

ALL 

sections are fully supported.

Typical transition

assembly detail

Fig.

6

6

Important

Splitter

Splitter
Channel

Typical installation

detail  (plan view)

Fig.

5

Window/
Louvre

Содержание ecovent EVH

Страница 1: ...ates hazards associated with electric current and high voltages Indicates hazards that require safety advice for personnel or potential unit property damage Indicates important information page Introd...

Страница 2: ...e 7 Main Heating Null No Heating W LPHW Coil E Electric Heater Battery 8 Casework Lining Null Standard A1 Variant sequential 9 Handing LB Left Bottom Access RB Right Bottom Access 10 Main Filter Null...

Страница 3: ...lity of persons or objects coming into contact with the impeller whilst operational a guard should be fitted or steps taken to prevent this It is the installer s responsibility to ensure that access p...

Страница 4: ...ing detail Fig 3 Installation 4 Important Ecovent EVH units are intended to be connected to a wall or window mounted louvre This can be a direct connection from unit to louvre or via a specific transi...

Страница 5: ...ts Fix the bracket parts to both sides of unit and transition as shown using the M6 fixings provided Tape the joint using self adhesive rubber tape prior to assembly to prevent air leakage To finish t...

Страница 6: ...EVH LPHW units are fitted with a coil temperature sensor as standard ensuring that boilers run continuously in low ambient temperatures can help to prevent this On Ecovent EVH W units a Low Pressure...

Страница 7: ...that no internal components are damaged during this installation Make certain all swarf is removed before use It is the customer s responsibility to supply earth fault protection through the building...

Страница 8: ...t Eastleigh Hampshire SO53 4NF Tel 023 8046 1150 Fax 023 8026 1204 E mail vesltd ves co uk Web www ves co uk EVH Hybrid Ventilation Unit Installation Operation and Maintenance Manual Standard Wiring F...

Страница 9: ...t Eastleigh Hampshire SO53 4NF Tel 023 8046 1150 Fax 023 8026 1204 E mail vesltd ves co uk Web www ves co uk EVH Hybrid Ventilation Unit Installation Operation and Maintenance Manual Standard Wiring F...

Страница 10: ...witching by unauthorised operatives The Boost System Healthy indication will stop illuminating until the unit resumes normal operation The Open windows indication shall illuminate when the external te...

Страница 11: ...s the wind and elements may cause moving parts to windmill In general this series of units require little maintenance In the unlikely event of component failure spares are available from stock at VES...

Страница 12: ...bly removal installation Fig 16 Ecovent EVH units feature double inlet centrifugal fans mounted on an adapter plate The supply fans are clearly visible beneath the main access panel To remove replace...

Страница 13: ...o keep dampers clean could result in the damper becoming inoperative Clean damper blades and frames and lubricate with PTFE aerosol or equivalent For units with integrated heating the heating coil sho...

Отзывы: