3
ORIGINAL INSTRUCTIONS
VES Andover Ltd Eagle Close Chandlers Ford Ind. Est. Eastleigh Hampshire SO53 4NF
Tel: 023 8046 1150 Fax: 023 8026 1204 E-mail: [email protected] Web: www.ves.co.uk
EVH Hybrid Ventilation Unit
Installation, Operation and Maintenance Manual
Immediately upon receipt of goods, check for possible damage in transit paying particular
attention to fan impellers, coil connections and unit casing. Prior to installation please check to
ensure alignment and smooth rotation of the impeller after transit. Also check to ensure that
any ancillary items are included. These will normally be supplied fitted or, in the case of small
items, taped to the unit.
In the event of any damage having occurred or if any item is found to be missing, it is essential
to inform VES Andover Ltd. within
7 days
of delivery quoting sales order number and the unit
type, as found on the unit nameplate. After this period, VES is unable to accept any claim for
damaged or missing goods.
The entire system must be considered for safety purposes. It is the responsibility of the
installer to ensure that all of the equipment is installed in compliance with the manufacturer’s
recommendations, with due regard to the current HEALTH AND SAFETY AT WORK ACT and
conforms to all relevant statutory regulations.
Where a unit is installed such that component failure could result in injury to personnel,
precautions should be taken to prevent such an injury. If the unit is installed where there is a
reasonable possibility of persons or objects coming into contact with the impeller whilst
operational, a guard should be fitted or steps taken to prevent this. It is the installer’s
responsibility to ensure that access panels are not obstructed in any way. Safe working access
for maintenance must be provided in accordance with Health and Safety and Building
Regulations. For confirmation of required access please see the appropriate unit outline
drawing.
For safe maintenance, consideration must also be given by the installer for adequate
illumination of the unit location. Further consideration should be given to the unit’s position
and secured into place as appropriate.
Mounting hangers, door furniture, isolators etc. extend beyond the casework, so are vulnerable
to accidental damage. Take necessary precautions so as not to cause damage whilste handling
the unit.
The weight of each unit/section is specified on the outline drawing and the total unit weight will
be displayed on the unit inspection label. When lifting the unit using a fork lift truck ensure the
whole unit is supported by the full length of the forks. It may be necessary to use fork extensions
to fully support the unit. The centre of gravity may be offset from the centre of the unit; this
needs to be taken into consideration when lifting the unit.
Handle with care. Failure to fully support the unit during lifting may result in damage to the
unit casework
Units are to be rigged and lifted using spreaders, taking
into account the weight of the unit. Lifting gear should
be arranged so as not to bear on the casework, see right.
Caution
Receipt of Goods
and Handling
Installation
3
Lifting Detail
Fig.
2
4
Caution
Fork Lifting Detail
Fig.
1