![Vertiv Liebert NXL 1100 Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/vertiv/liebert-nxl-1100/liebert-nxl-1100_installation-manual_1008262043.webp)
Installation Drawings
Vertiv
Large System, 3-Phase UPS Battery System Installation Manual
36
Figure 33
Attached battery cabinet connections
Figure 34
Ground strap location for connected cabinets
Jumper Busbars
(supplied with battery cabinet)
Jumper Busbars
(supplied with battery cabinet)
Torque to 240in-lb (27 N-M)
Connections cannot be made
if cabinets ordered as stand-alone.
Reference of
corner post of
connected cabinets
Cabinet-to-Cabinet
Bolting Instructions
NOTES
1. Apply ground strap hardware to specified
locations.
2. Torque Values: M6: 40 in-lb (5 Nm)
M10: ( 14 Nm ) 120 in-lb
Typical ground strap installation
for battery cabinet to UPS or ancillary
cabinet connections.
2
2
Front Side
of Units
Front Side
of Units
Typical ground strap installation
for battery cabinet-to-battery cabinet
connections.
Battery
Cabinet
Battery
Cabinet
Battery
Cabinet
1
1
A
B
DETAIL A
DETAIL B
Содержание Liebert NXL 1100
Страница 2: ...Liebert Large System 3 Phase UPS Battery System Installation Manual...
Страница 69: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 62 NOTES...
Страница 70: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 63...
Страница 71: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 64...