Product Handling and Installation
17
After completing the above preparations, please proceed to the next step:
1) Place the lower section on the preset position of floor stand.
2) Install the lower section on the floor stand, and then connect the base and the lower section with seismic restraint
brackets (SRB).
Figure 5-4 SRB
Note: 100 mm is only the recommended height, the actual height should be determined according to the site conditions.
5.3. Upper Cabinet Hoisting
After the lower cabinet and the floor stand are fixed, the upper cabinet needs to be hoisted on top of the lower cabinet to
form a whole unit.
Please follow the steps below for hoisting:
1) Install hoisting fixtures on the aluminum profiles in the lower part of the upper cabinet.
The hoisting tooling is composed of four steel frames and four hoisting rings. During installation, a professional is required to
install it firmly.
The installation effect diagram of hoisting tooling is shown in
.
Figure 5-5 Hoisting Tooling