
TM036 Vermont Gas Fireplace & Gas Log Fire Service Instructions REV: A
D.O.I: 17/01/2008
This document is stored and maintained electronically by
Service. All printed copies not bearing this statement in RED are deemed “uncontrolled”
36
Log Assembly
– LHEC30 (Procedure 2)
1. Remove front glass assembly (refer to procedure 1).
2. Remove logs and larva rock from burner.
Reassemble as follows:
3. Place rear centre log KR24 on rear log bracket. Locate the two holes in bottom of log
over the centre two bracket studs.
4. Place left log KR22 on rear log bracket. Locate the two holes in bottom of log over the
left two bracket studs.
5. Place right log KR23 on rear log bracket. Locate the two holes in bottom of log over the
right two bracket studs.
6. Place left front log KR25. Position notch in lower right hand side of log against second
grate from left. The top left hand edge of log KR25 rests in notch on log KR22.
7. Place right front log KR26. Position notch in centre of Y part of log against third grate
from right. The top edge of log KR26 rests in notch on log KR23.
8. Place larva rock on top of burner in the two vacant spaces between logs.
Sheet Metal Base Assembly
– LHEC30 (Procedure 3)
Wear Personal Protective Equipment when conducting step 3 of this
procedure to reduce the risk of electric shock. Refer to Rheem Safety
Procedure on electrical testing.
1.
Isolate power and gas supplies to the log fire
and open front lower access louvre.
2. Remove two nuts retaining transformer cover and lift out transformer cover.
3.
Confirm with a multi-meter between Active and Neutral, then Active and Earth,
then Neutral and Earth terminals of the transformer that voltage is not present.
4. Remove glass frame assembly (refer to procedure 1).
5. Remove log assembly and larva rock from burner (reverse procedure 2).
6. Remove screw retaining front right hand ember rack bracket to sheet metal base and
remove ember rack by withdrawing from left hand bracket.
7. Remove three screws retaining gas valve access cover to sheet metal base and
remove gas valve access cover.
8. Disconnect gas supply line at gas valve.
9. Remove four screws retaining burner sheet metal base assembly to side brackets. Two
screws are located on each side of sheet metal base assembly.
10. Lift up and remove burner sheet metal base assembly. The burner, pilot assembly and
gas valve will come away with the sheet metal base assembly. The power supply,
blocked flue switch wiring and fan wiring will need to be disconnected at the gas valve
to enable the sheet metal base assembly to be completely removed.
11. Complete reassembly in reverse order of above. Use thread tape when reconnecting
gas supply line to the gas valve.
12. Test for gas leaks at all unions using soapy water solution.