10002789/0
-17-
DBT33/DBT36/DBT39
V
ERTICAL
T
HROUGH
-T
HE
-R
OOF
I
NSTALLATION
1. Locate your replace.
2. Plumb to centre of the (4") ue collar from ceiling above
and mark position.
3. Cut opening equal to 9-3/8" x 9-3/8" (240 mm x 240 mm).
4. Proceed to plumb for additional openings through the
roof. In all cases, the opening must provide a minimum of
1 inch clearance to the vent pipe, i.e., the hole must be at
least 9-3/8" x 9-3/8" (240 mm x 240 mm).
5. Place replace into position.
6. Place restop(s) #7DVFS or Attic Insulation Shield
#7DVAIS into position and secure. (Fig. 35)
7. Install roof support (Fig. 36) and roof ashing making
sure upper ange of ashing is below the shingles. Fig.
37.
8. Install appropriate pipe sections until the venting is above
the ashing. (See Fig. 37).
9. Install storm collar and seal around the pipe.
10. Add additional vent lengths for proper height. Fig. 38.
11. Apply high temperature sealant to 4" and 7" collars of
vertical vent termination and install.
If there is a room above ceiling level, restop
spacer must be installed on both the bottom and
the top side of the ceiling joists. If an attic is
above ceiling level a 7DVAIS (Attic Insulation
Shield) must be installed.
The enlarged ends of the vent section always
face downward, Fig. 37.
Fig. 35
Fig. 36
Fig. 37
Fig. 38
Содержание DBT33
Страница 10: ...DBT33 DBT36 DBT39 10 10002789 0 Fig 11 Fig 12 Fig 13 Fig 14 Fig 15 ...
Страница 24: ...DBT33 DBT36 DBT39 24 10002789 0 TROUBLE SHOOTING THE GAS CONTROL SYSTEM HONEYWELL MILLIVOLT VALVE ...
Страница 28: ...DBT33 DBT36 DBT39 28 10002789 0 PARTS PICTORIAL ...
Страница 33: ...10002789 0 33 DBT33 DBT36 DBT39 ...