background image

12

Chateau™ Decorative Gas Appliance

20009543

Horizontal Termination

The vent must rise vertically a minimum of 24”         
(610 mm) off the top of the unit, before the first elbow. 
The horizontal run may extend up to 20’ (6 m) and 
include a vertical rise of up to 40’ (12 m). (Fig. 14) Hori-
zontal termination must also meet the criteria shown in 
Figures 11 & 12.

• 

Approved vent systems must terminate above and 
including the heavy line in Figure 14.

• 

Two 45° elbows may be substituted for each single 
90° elbow.

• 

With a rise between 2’ - 4’, one (1) 90° or two (2) 45° 
elbows may be used.

Vertical Termination

A vertical vent system must terminate no less than 12’ 
(3.66 m) and no more than 40’ (12 m) above the appli-
ance flue collar. A 2’ (610 mm) vertical section must be 

��
��
��
��
��
��
��
��
��
��




���
���



� �

� �� �� �� �� �� �� �� �� �� �� ��

Vertical Run (in feet)

(Measured from the appliance flue collar to the top of the vent

 pi

pe.)

Horizontal Run (in feet)

��

��

��

��

��

��

��

��

��

��

��

��

��

��

��

��

��

��

��

��

• • • • • • • • • • • •
• • •• • • • • • •
• • ••• • • •• •••••••••••
• • • ••• • •••••••••
• •• • • • • • • •
• •• • •• • ••• ••••••••••••••

May use up to 

three (3) 90° 

elbows, but must 

not have two (2) 

consecutive 90° 

elbows in horizon-

tal plane

Unacceptable vent-

ing configuration

FP1359

Fig. 14

  Horizontal vent termination window.

May use 

one (1) 

elbow 

only

Restrictor Plate Guide

 

Application 

NG 

LP

  SK8DVSK or 

 

 

  2’ (610mm) vertical elbow,  

 

 

  2’ (610mm) horizontal 

None 

None

  4’ (1.2m) vertical elbow 

 

4

¹⁄₂

” flue  

  10’ (3m) horizontal elbow 

None 

restrictor 

  8’ (2.4m) vertical 

 

  12’ (3.7m) vertical & greater  6

³⁄₄

” flue 

6

³⁄₄

” flue 

   

 restrictor   restrictor

proper sealing. Be sure to always attach straps on up-
per elbow to a structural framing member.
For vertical installations, continue installing the pipe as 
required until pipe is installed up through the ceiling. At 
this point, you must install a firestop spacer.

installed before any offset. A maximum of 20’ (6.1 m) 
horizontal and three (3) 90° elbows may be installed 
with a minimum of 12’ (3.66 m) vertical section above 
the flue collar of the unit. Refer to Page 13, Figure 15 
for more information. 
A vertically terminated vent system must also conform 
to the following criteria:

• 

No more than three (3) 90° elbows may be used.

• 

Two (2) 45° elbows may be substituted for one (1) 
90° elbow. No more than six (6) elbows may be 
used.

• 

Vent must rise a minimum of 2’ (610 mm) before 
offset is used. 

• 

Termination height must conform to roof clearance 
as specified in Figure 35.

• • • • • • • • • • • •
• • •• • • • • • • • • • •
•• • •• •••• •• • • • • • • • • • • • • •
• •• • • • • •

Pipe Section

Pipe 

Rim

Pipe 

Rim

Hem

Lance

FP1468

Fig. 13

  Install pipe, listening for the snap-lock to fasten.

UP

Содержание Chateau DVT38S2

Страница 1: ...ice must be performed by a quali ed installer service agency or the gas supplier WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electric switch Do not use any phone in...

Страница 2: ...eneral Information Assembling Vent Pipes 11 SK8 Venting Pipes 11 Restrictor Plate Guide 12 Horizontal Termination 12 Vertical Termination 12 Sidewall Applications 13 Sidewall Installation 14 Sidewall...

Страница 3: ...le or any combustible material other than wood this replace must be installed on a metal or wood panel extending the full width and depth of the replace 12 This replace requires adequate ventilation a...

Страница 4: ...ded especially if the mantel is not available at the time of framing A framing stud is allowed to be placed on the inside of the 6 152 mm standoff on the side of the unit where the conduit is located...

Страница 5: ...ce is dependent on the depth of the mantel This also applies to the distance between the mantel leg if tted and the replace For the correct mounting height and widths refer to Figs 3a and 3b the follo...

Страница 6: ...the valve box assembly to the framing members open the box door remove extension knob s remove the valve cover by removing the two 2 screws securing the valve cover to the box hold the cover plate wi...

Страница 7: ...pper tubing or 1 2 gas tight Some municipalities have additional local codes it is always best to consult your local authority and the CSA B149 1 installation codes For USA installations consult the c...

Страница 8: ...ed with an ON OFF rocker switch at the valve box assembly If a wall switch is desired fol low these instructions 1 The valve box is equipped with two knockouts at the top right and left corners The ri...

Страница 9: ...Do not locate termination hood where excessive snow or ice build up may occur Be sure to check vent termi nation area after snow falls and clear to prevent ac cidental blockage of venting system When...

Страница 10: ...nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh 3kW 9 other appliances appliances 10 0...

Страница 11: ...The venting system must conform with local codes and or the current National Fuel Gas code ANSI Z223 1 NFPA 54 Only venting components manufactured by CFM Cor poration can be used in Direct Vent syste...

Страница 12: ...ow May use one 1 elbow only Restrictor Plate Guide Application NG LP SK8DVSK or 2 610mm vertical elbow 2 610mm horizontal None None 4 1 2m vertical elbow 4 ue 10 3m horizontal elbow None restrictor 8...

Страница 13: ...al vent length of vent pipe from the ue collar of the re place to the face of the outer wall Horizontal plane means no vertical rise exists on this portion of the vent assembly The maximum number of 9...

Страница 14: ...r and outer ue collars of the replace using UL approved metal adhesive tape to ensure the joints are sealed Attach an appropriate length of vent pipe to the replace Follow with the installation of the...

Страница 15: ...Facing Outside CAUTION Unit must be installed with stationary glass facing outside Control panel assembly will be located on the left side of the unit when facing the unit form inside house Failure t...

Страница 16: ...e check that the vent pipes overlap the collars by 2 51 mm Secure the termina tion to the wall with screws provided and caulk around Installing the 38S2VDK Door When installing the DVT38S2 on an outsi...

Страница 17: ...3 7m or greater measured from the top of the ue collar the restrictor plate as supplied with this unit should be used Fig 28 Refer to Page 21 Figure 37 for restrictor plate installation X FP1461 Fig...

Страница 18: ...ousing fettle andirons logs and glowing embers in reverse order Refer to Page xx for log installation Pipe Straps Every 3 914mm FP1463 Fig 32 Support straps for horizontal runs Max 20 6m Max Height 40...

Страница 19: ...use the appropriate starter kit Refer to Venting Components List The minimum height of the vent above the highest point of penetration through the roof is 2 610 mm Fig 37 FP593 SR C 11 20 97 Attic In...

Страница 20: ...02 sta CFM190 Fig 37 Minimum termination to roof clearance FP270 271 CR Series 2 19 99 djt Support Structure Elbow Strap must be tight Ceiling Hole Framing Angled Firestop Chimney Support Strap must...

Страница 21: ...act with AIS SK the chimney system Chimney Support Used to support chimney for each of 30 vertical SKCS8 height and 6 of angled chimney run Round Top Termination Top used to terminate chimney at roof...

Страница 22: ...each operating season depending on the environment in the house Clean the glass after the rst two weeks of operation The use of any non approved replacement glass will void all product warranties Car...

Страница 23: ...fractories already installed 6 Reinstall the burner tube and fettle FP1580 DVT38s2 refractory 6 05 Refractory Left Side Refractory Right Side FP1580 Fig 40 Ceramic refractory panels Refractory Left He...

Страница 24: ...ettle and set down over the burner tube assembly Repeat the same procedure on the opposite side 5 Position the log pilot plumbing Fig 44 Hold the log with the two 2 branches facing down and set it dow...

Страница 25: ...in positioning the log Hold the log with the at surface facing down and the burned out end closer to you NOTE Position this log through the side with the con trol valve box on the left side Set the l...

Страница 26: ...P390 FLAME ADJUSTMENT KNOB 11 21 96 SIT 820 Valve Fig 53 Flame adjustment knob for SIT valve Flame Temperature Adjustment RN RP EN EP Models For units equipped with HI LO valves the ame adjustment is...

Страница 27: ...ure the bottom is over lapping the bottom trim piece The right side of the trim should butt up against the right side nailing ange of the replace 3 Place the left trim on the left side of the window f...

Страница 28: ...some gas is heavier than air and will settle on the oor WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electric switch Do not use any phone in your building Immediatel...

Страница 29: ...h in or turn by hand do not try to repair it call a quali ed service technician Force or attempting repair may result in a re or explosion D Do not use this appliance if any part has been under water...

Страница 30: ...burner assembly utilizes both a thermocouple and a thermopile The thermocouple operates the main valve operation On and Off Clean and or adjust pilot for maximum ame impingement on thermopile and ther...

Страница 31: ...ply Tubing And Pressures Are Good And Pilot Burner Orifice Is Not Blocked Check Electrical Connections Between Module And Pilot Operator On Gas Control Check For 24vac Across Pv mvpv Terminals On Modu...

Страница 32: ...tte trousse L installation n est pas termin e tant que le fonc tionnement de l appareil converti n a pas t v ri selon la notice du fabricant qui accompagne la trousse ATTENTION Avant d effectuer la co...

Страница 33: ...LO pressure regulator assembly to the valve using the new screws E supplied with the kit Tighten the screws securely Ref torque in lb Fig 62 15 Install the enclosed identi cation label F to the valve...

Страница 34: ...acuum burner compartment especially around ori ce primary air openings 6 Visually inspect pilot Brush or blow away any dust or lint accumulation 7 Reinstall logs 8 Ignite pilot Refer to Lighting Instr...

Страница 35: ...e without notice DVT38S2 Decorative Gas Appliance 1a 1b 2 1e 1 2 3 6 7a 8 9a b 10a b 11a b 12a b THTP TP TH 12c d 13a b 13c d 18 MV MVPV PV GND BURNER 24V GND 24V SENSE SPARK 19 20 26 9543 DVT38s2 par...

Страница 36: ...76 5 Spring Latch Assembly 20005788 6 Burner Housing Assembly 20009392 7a Burner 20009311 7b Burner Tube Assembly Pilot Side 20009308 8 Manifold Tube Assembly 20009282 9a Burner Housing Ori ce 55 LP 3...

Страница 37: ...lpack Tube not shown 53326 30 Screw 1 4 20 x 1 5 Black Pan Quad Glass Frame Screw 20006471 31 Tube Pilot 1 4 OD x 76 Long 20008828 32 1 4 Shear off Nut for Pilot Connection 20009102 33 1 4 Shear off N...

Страница 38: ...he control box spacer Fit the control box tight against the spacer G and the frame piece above Fasten the control box to the frame piece with 1 screws through the holes in the top of the control box F...

Страница 39: ...pection thedamageisfoundtobethefaultofthemanufacturer repairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisions of this warrant...

Страница 40: ...Ratings Model EnerGuide Ratings Fireplace Ef ciency DVT38S2RN 47 1 DVT38S2RP 47 1 DVT38S2EN 48 2 DVT38S2EP 48 2 410 Admiral Blvd Mississauga Ontario Canada L5T 2N6 800 668 5323 www cfmcorp com CFM Co...

Отзывы: