15
61D1013
BUF Vent-Free Fireboxes
OpTIONAL EqUIpMENT
FORCED AIR kIT
(FA2A)
If you are installing the forced air kit, Model FA2A, see the
installation instructions provided with the kit for electrical
wiring requirements, or the blower installation section. The
firebox must be connected to main power supply at time of
firebox installation. The blower must be installed prior to
the installation of the vent-free heater. The electrical con-
nections must be made before the firebox is framed and
enclosed in the finished walls.
W
ARNING
Electrical connections should only
be performed by a qualified, licensed
electrician, main power must be off when
connecting to main electrical power supply
or performing service.
The blower when installed, must be
electrically grounded in accordance with
local codes or in the absence of local codes,
with the National Electrical Code ANSI/NFpA
70.