TYPICAL STRAIGHT-UP INSTALLATION

40 FEET

(12.2m)

ATTIC INSULATION 

SHIELD

JOISTS

ROOF

VENT TERMINATION

ATTIC INSULATION

ROOF SUPPORT

STORM COLLAR

ROOF FLASHING

2' Min.

CEILING JOISTS

Fig. 33

1.

Locate your fireplace.

2.

Plumb to centre of the (4") collar from ceiling above and
mark position.

3.

Cut opening equal to 9-3/8" x 9-3/8" (240 mm x 240
mm).

4.

Proceed to plumb for additional openings through the
roof. In all cases, the opening must provide a minimum
of 1 inch clearance to the vent pipe, i.e., the hole must
be a minimum of  9-3/8" x 9-3/8" (240 mm x 240 mm).

5.

Place firestop(s) 7DVFS into position and secure. (Fig.
32)

6.

Install roof support (Fig. 30) and roof flashing making
sure upper flange of flashing is below the shingles.
(Fig. 33)

7.

Install appropriate pipe sections until above the flash-
ing. (See Fig. 31 for #'s 7, 8 and 9).

8.

Install storm collar and seal around the pipe.

9.

Add additional vent lengths for proper height.

10. Apply high temperature sealant to 4" and 7" collars of

vent termination and  install.

VERTICAL THRU THE ROOF INSTALLATION

Fig. 32 If there is a room above ceiling level,
firestop spacer must be installed on both the
bottom and the top side of the ceiling  joists.  If an
attic is above ceiling level a 7DVAIS (Attic
Insulation Shield) must be installed.

 Fig. 33. The enlarged ends of the vent section
always face downward.

SEALANT

SHEETMETAL 
SCREWS (#5) —
3 PER JOINT

STORM
    COLLAR

JOIST

11"

11"

Attic 
Insulation
Shield

Ceiling 
Installation

JOIST

NAILS (4)

FIRESTOP
SPACER

11"

11"

UPPER FLOOR

Fig. 32

Fig. 29

Fig. 30

TYPICAL 7DVCS

APPLICATION

TYPICAL ROOF 

SUPPORT

APPLICATION

Fig. 31

Fig. 28

Clearance above a roof shall extend a
minimum of 24" (610mm) above the
highest point when it passes through
the roof surface, and any other
obstruciton within a horizontal dis-
tance of 18" (450mm).

45°

45°

2438mm

MAX.

8 FEET

2438mm

MAX.

8 FEET

TYPICAL OFFSET INSTALLATION

40 FEET
(12.2m)

Содержание BHDT36

Страница 1: ...supplier from your neighbours phone Follow the gas suppliers instructions If you cannot reach your gas supplier call the fire department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXAC...

Страница 2: ...ions 14 Vertical Through the Roof Applications 14 Vertical Through the Roof Installation 15 Crimped End Venting Components 16 Assembling Twist Lock Vent Pipes 17 Vertical Sidewall Applications 17 How...

Страница 3: ...ied service person A profes sional service person should be contacted to inspect this fireplace annually Make it a practice to have all of your gas fireplaces checked annually More frequent cleaning m...

Страница 4: ...7 1 4 946mm I 7 1 8 181mm J 6 3 4 171mm K 10 254mm L 13 1 2 343mm M 39 3 4 1010mm N 55 1 4 1403mm O 28 1 8 714mm ROD 16 1 2 419mm ROW 36 1 2 927mm ROH 35 889mm FIREPLACE DIMENSIONS Fig 2 BHDT36 D C G...

Страница 5: ...left and right hand side of the fireplace 3 Frame in fireplace with a header across the top It is important to allow for finished face when setting the depth of the frame 4 Attach fireplace to frame...

Страница 6: ...ouvre opening GAS INLET MANIFOLD PRESSURES Input Minimum Input Maximum Manifold Pressure NATURAL LP Propane 11 wc 13 wc 10 wc 4 5 wc 7 wc 3 5 wc GAS SPECIFICATIONS MAX MIN INPUT INPUT MODEL FUEL GAS C...

Страница 7: ...d ratings Typical gas supply installation Always check for gas leaks with a mild soap and water solution Do not use an open flame for leak testing The gas control is equipped with a captured screw typ...

Страница 8: ...th dwellings only permitted if veranda porch deck is fully open on a minimum 2 sides beneath the floor as specified in CAN CGA B149 1 or 2 Installation Codes 1991 for Canada or for U S A Installations...

Страница 9: ...219mm for recessed location D Minimum width for back wall of a recessed location Combustible 38 965mm Noncombustible 24 610mm E Clearance from corner in recessed location Combustible 6 152mm Noncombus...

Страница 10: ...ed in Vertical Sidewall installations VERTICAL SIDEWALL APPLICATIONS Minimum clearance between vent pipes and combustible materials is one 1 inch 25 mm on top bottom and sides unless otherwise noted W...

Страница 11: ...nce with same EXAMPLE A If the vertical dimension from the floor of the unit is 11 feet 3352mm the horizontal run to the face of the outer wall must not exceed 14 feet 4267mm EXAMPLE B If the vertical...

Страница 12: ...d attach to firestop with 8 sheet metal screws supplied Install firestop assembly STEP 2 Zero clearance sleeve is only required for combustible walls VERTICAL SIDEWALL APPLICATION Fig 20 8 SCREWS 2 AD...

Страница 13: ...vent termination 4 and 7 collars into their respective vent pipes Double check that the vent pipes overlap the collars by 2 50mm Secure the termination to the wall with screws provided and caulk aroun...

Страница 14: ...erved The maximum horizontal run with 24 610mm vertical rise is 36 914mm from the back of the fireplace to the face of the exterior wall See vent graph Fig 17 for extended horizontal run if the vertic...

Страница 15: ...rm collar and seal around the pipe 9 Add additional vent lengths for proper height 10 Apply high temperature sealant to 4 and 7 collars of vent termination and install VERTICAL THRU THE ROOF INSTALLAT...

Страница 16: ...90 transition elbow kit 7DVRT90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7DVP610 6 to 10 adjustable length 7DVP1018 10 to 18 adjustable length 7DVP1834 18 to 34 adj...

Страница 17: ...the installation with twist lock pipe placing the female end over the male end and fastening with 3 sheet metal screws You do not have to use high temperature sealant when using twist lock pipe betwee...

Страница 18: ...does not apply if the 45 degree elbows are installed on the vertical part of the vent sys tem If a 90 degree elbow is used in the horizontal vent run level height maintained the maxi mum horizontal ve...

Страница 19: ...6 27 28 29 30 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 eg A eg B VERTICAL DIMENSION FROM THE FLOOR OF THE UNIT TO THE CENTRE OF THE HORIZONTAL VENT PIPE Fig 39 COMBUSTIBLE WALLS Fig 40 Cut a 9 3...

Страница 20: ...h three 3 sheet metal screws Wipe off any excess high temperature sealant Always install horizontal venting on a level plane BEAD OF SEALANT Sealing vent pipe and firestop gaps with hi temperature sea...

Страница 21: ...aximum horizontal run with 24 610mm vertical rise is 36 914mm from the back of the fireplace to the face of the exterior wall See vent graph Fig 36 for extended horizontal run if the vertical exceeds...

Страница 22: ...For each 45 elbow used on the horizontal level the maximum horizontal length must be reduced by 18 inches 457mm Example Maximum horizontal length 0 45 elbows 10 ft 3048mm 1 45 elbows 8 5 ft 2590mm 2 4...

Страница 23: ...ate pipe sections until above the flash ing See Fig 53 for s 7 8 and 9 8 Install storm collar and seal around the pipe 9 Add additional vent lengths for proper height 10 Apply high temperature sealant...

Страница 24: ...ow kit 7DVT45 for Vertical Installation Offsets 90 transition elbow kit 7TDVRT90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7TDVP1218 12 to 18 adjustable length 7TDVP...

Страница 25: ...s 3 Under no circumstances should this appliance be operated without the front glass or with a broken glass Replacement of the glass with gasket as supplied by themanufacturershouldbedonebyalicencedqu...

Страница 26: ...ss Removal Section 2 Remove logs from the packaging As with all plastics these are not toys and should be kept away from children and infants 3 Place rear log BH2 on rear bracket ensure log is seated...

Страница 27: ...iodically perform a visual check of the pilot and the burner flames Compare them to the pictorials illustrated below Fig 61 62 and 63 If any of the flames appear abnormal call a service person INSPECT...

Страница 28: ...rame Removal in manual 8 Visibly locate pilot by the main burner 9 Turn knob on gas control counterclockwise to PILOT C Use only your hand to push in or turn the gas control knob Never use tools If th...

Страница 29: ...ADJUST PILOT FLAME HEIGHT ALL WIRING CONNECTIONS REPLACE THERMOPILE THERMOCOUPLE NEEDS A MINIMUM OF 14mV DEFECTIVE VALVE TURN TO PILOT METER SHOULD READ GREATER THAN 100 mV IF NOT REPLACE PILOT LIGHTS...

Страница 30: ...IEZO IGNITOR GENERATES SPARK ELECTRODE CABLE NOT GROUNDED PILOT STAYS ON FLAME ENGULFING THERMOCOUPLE BY 3 8 THERMOCOUPLE ATTACHED TO VALVE MNIMUM MILLIVOLT OPEN CIRCUIT 18MV CLOSED CIRCUIT 5MV VENT S...

Страница 31: ...w fittings 10001296 12 Manifold Tubing w fittings 57318 13 Thermocouple SIT 53373 14 Thermocouple PSE 10001825 15 Thermopile 51827 16 Electrode Ignitor w cable SIT 10001297 17 Ignitor Piezo SIT 52464...

Страница 32: ...CEMENT PARTS 27 26 24 25 22 4 a b 17 31 32 33 30 30 29 21 23 19 a b 5 a b 34 2 28 36 31 12 L O H I PILOT ADJ P I L O T ON OFF 20 a b 18 8 a b 3 6 a b 16 11 9 15 13 7 a b 10 15 14 1 COMPLETE LOG SET 1c...

Страница 33: ...ther box Black wire from supply should connect to the variable speed switch Alternate speed switch wire connects to temperature sensor Alternate lead from sensor connects to fan Alternate fan lead con...

Страница 34: ...SS TOP LOUVRE SPACERS SIDE PANEL SIDE PANEL BASE SIDE SUPPORTS BURNER TRAY LOG SUPPORT BACK PANEL SIDE TAB SIDE TAB BASE SIDE REFRACTORY BASE SIDE REFRACTORY FIREBOX BACK REAR LOG SUPPORT REFRACTORY B...

Отзывы: