DO NOT BACK FILL AROUND SNORKEL.
SOIL SHOULD NOT BE LESS THAN 4"
(100mm) BELOW SNORKEL.

FOUNDATION 

RECESS 

SNORKEL 

SCREWS

WALL

SCREWS

SHEET METAL

WATERTIGHT

SEAL

AROUND

PIPE

If the foundation is recessed, use recess brackets (not
supplied) for securing lower portion of the snorkel.  Fasten
brackets to wall first and then secure to snorkel with self
drilling #8 x 1/2 sheet metal screws.  It will be necessary to
extend vent pipes out as far protruding wall face (Fig. 26).

VERTICAL THROUGH THE

ROOF APPLICATIONS

This Gas Fireplace has been approved for,
a) Vertical installations up to 40 feet (12  metres) in height.

Up to a 10 ft.(3048mm) horizontal vent run can be
installed within the vent system using a maximum of
three 90

°

 elbows.

b) Up to two 45

°

 elbows may be used within the horizontal

run.  For each 45

°

 elbow used on the horizontal level

the maximum horizontal length must be reduced by 18
inches (457mm).

Example:  Maximum horizontal length

0

-

45

°

 elbows 10 ft. (3048mm)

1

-

45

°

 elbows 8.5 ft. (2590mm)

2

-

45

°

 elbows 7 ft. (2133mm)

BELOW GRADE INSTALLATIONS

When it is not possible to meet the required vent terminal
clearances of 12 inches (305mm) above grade level a
model #7DVSKS vent kit is required.  It allows installation
depth of down to 7 inches (178mm) below grade level.  The
7 inches is measured from the centre of the horizontal vent
pipe as it penetrates through the wall.

If venting system is installed below ground,
we recommend a window well with adequate
and proper drainage.

Ensure sidewall venting clearances are observed.

The maximum horizontal run with 24"  (610mm)
vertical rise is 36" (914mm) from the back of
the fireplace to the face of the exterior wall.
See vent graph (Fig. 17) for extended horizontal
run if the vertical exceeds 24" (610mm).

1.

Establish vent hole through the wall.  See page 12

2.

Remove soil to a depth of approximately 16"
(406mm) below base of snorkel.  Install window well
(not supplied).  Refill hole with 12" (305mm) of
coarse gravel leaving a clearance of approximately
4" (100mm)below snorkel. (Fig. 25)

3.

Install vent system.  See page 12/13, Steps 2
through 5.

4.

Ensure a watertight seal is made around the vent
pipe coming through the wall.

5.

Apply high temperature sealant caulking (supplied)
around the 4 and 7 inch 7DVSKS's snorkel collars.

6.

Slide into vent pipe and secure to the wall.

7.

Level the soil so as to maintain a 4"
(100mm)clearance below snorkel (Fig. 25).

Fig. 27

c)

A minimum of an 8 ft. vertical rise.

d) Two sets of 45 degree elbow offsets within these

vertical installations.  From 0 to a maximum of 8 ft.
(2438mm) a vent pipe can be used between elbows.
(Fig. 28)

e) 7DVCS must be used to support offsets. (Fig. 29)
This application will require that you first determine the roof
pitch and use the appropriate 7DVSKV (A,B or F).  (see
Venting Components, page 16)

Fig. 25

Fig. 26

GRAVEL

DRAIN

FIRESTOP

FOUNDATION WALL

WINDOW WELL

7DVSKS (SNORKEL)

GROUND

24"/608mm

MINIMUM* 

7" PIPE

SCREWS

MINIMUM

4" CLEARANCE

ZERO CLEARANCE

SLEEVE IF REQUIRED

A minimum of 24"/608mm
vertical pipe must be installed when 
using the 7DVSKS/7TDVSKS kit.

The 22" vertical rise (center to
center) of the snorkel may be
included for calculation of max.
horizontal run.

*

*

MAXIMUM

10 FT

(3048mm)

PIPE STRAPS

EVERY 3’

(914mm)

MINIMUM

8 FT./

MAXIMUM 

40 FT.

VERTICAL

RISE

Содержание BHDT36

Страница 1: ...supplier from your neighbours phone Follow the gas suppliers instructions If you cannot reach your gas supplier call the fire department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXAC...

Страница 2: ...ions 14 Vertical Through the Roof Applications 14 Vertical Through the Roof Installation 15 Crimped End Venting Components 16 Assembling Twist Lock Vent Pipes 17 Vertical Sidewall Applications 17 How...

Страница 3: ...ied service person A profes sional service person should be contacted to inspect this fireplace annually Make it a practice to have all of your gas fireplaces checked annually More frequent cleaning m...

Страница 4: ...7 1 4 946mm I 7 1 8 181mm J 6 3 4 171mm K 10 254mm L 13 1 2 343mm M 39 3 4 1010mm N 55 1 4 1403mm O 28 1 8 714mm ROD 16 1 2 419mm ROW 36 1 2 927mm ROH 35 889mm FIREPLACE DIMENSIONS Fig 2 BHDT36 D C G...

Страница 5: ...left and right hand side of the fireplace 3 Frame in fireplace with a header across the top It is important to allow for finished face when setting the depth of the frame 4 Attach fireplace to frame...

Страница 6: ...ouvre opening GAS INLET MANIFOLD PRESSURES Input Minimum Input Maximum Manifold Pressure NATURAL LP Propane 11 wc 13 wc 10 wc 4 5 wc 7 wc 3 5 wc GAS SPECIFICATIONS MAX MIN INPUT INPUT MODEL FUEL GAS C...

Страница 7: ...d ratings Typical gas supply installation Always check for gas leaks with a mild soap and water solution Do not use an open flame for leak testing The gas control is equipped with a captured screw typ...

Страница 8: ...th dwellings only permitted if veranda porch deck is fully open on a minimum 2 sides beneath the floor as specified in CAN CGA B149 1 or 2 Installation Codes 1991 for Canada or for U S A Installations...

Страница 9: ...219mm for recessed location D Minimum width for back wall of a recessed location Combustible 38 965mm Noncombustible 24 610mm E Clearance from corner in recessed location Combustible 6 152mm Noncombus...

Страница 10: ...ed in Vertical Sidewall installations VERTICAL SIDEWALL APPLICATIONS Minimum clearance between vent pipes and combustible materials is one 1 inch 25 mm on top bottom and sides unless otherwise noted W...

Страница 11: ...nce with same EXAMPLE A If the vertical dimension from the floor of the unit is 11 feet 3352mm the horizontal run to the face of the outer wall must not exceed 14 feet 4267mm EXAMPLE B If the vertical...

Страница 12: ...d attach to firestop with 8 sheet metal screws supplied Install firestop assembly STEP 2 Zero clearance sleeve is only required for combustible walls VERTICAL SIDEWALL APPLICATION Fig 20 8 SCREWS 2 AD...

Страница 13: ...vent termination 4 and 7 collars into their respective vent pipes Double check that the vent pipes overlap the collars by 2 50mm Secure the termination to the wall with screws provided and caulk aroun...

Страница 14: ...erved The maximum horizontal run with 24 610mm vertical rise is 36 914mm from the back of the fireplace to the face of the exterior wall See vent graph Fig 17 for extended horizontal run if the vertic...

Страница 15: ...rm collar and seal around the pipe 9 Add additional vent lengths for proper height 10 Apply high temperature sealant to 4 and 7 collars of vent termination and install VERTICAL THRU THE ROOF INSTALLAT...

Страница 16: ...90 transition elbow kit 7DVRT90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7DVP610 6 to 10 adjustable length 7DVP1018 10 to 18 adjustable length 7DVP1834 18 to 34 adj...

Страница 17: ...the installation with twist lock pipe placing the female end over the male end and fastening with 3 sheet metal screws You do not have to use high temperature sealant when using twist lock pipe betwee...

Страница 18: ...does not apply if the 45 degree elbows are installed on the vertical part of the vent sys tem If a 90 degree elbow is used in the horizontal vent run level height maintained the maxi mum horizontal ve...

Страница 19: ...6 27 28 29 30 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 eg A eg B VERTICAL DIMENSION FROM THE FLOOR OF THE UNIT TO THE CENTRE OF THE HORIZONTAL VENT PIPE Fig 39 COMBUSTIBLE WALLS Fig 40 Cut a 9 3...

Страница 20: ...h three 3 sheet metal screws Wipe off any excess high temperature sealant Always install horizontal venting on a level plane BEAD OF SEALANT Sealing vent pipe and firestop gaps with hi temperature sea...

Страница 21: ...aximum horizontal run with 24 610mm vertical rise is 36 914mm from the back of the fireplace to the face of the exterior wall See vent graph Fig 36 for extended horizontal run if the vertical exceeds...

Страница 22: ...For each 45 elbow used on the horizontal level the maximum horizontal length must be reduced by 18 inches 457mm Example Maximum horizontal length 0 45 elbows 10 ft 3048mm 1 45 elbows 8 5 ft 2590mm 2 4...

Страница 23: ...ate pipe sections until above the flash ing See Fig 53 for s 7 8 and 9 8 Install storm collar and seal around the pipe 9 Add additional vent lengths for proper height 10 Apply high temperature sealant...

Страница 24: ...ow kit 7DVT45 for Vertical Installation Offsets 90 transition elbow kit 7TDVRT90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7TDVP1218 12 to 18 adjustable length 7TDVP...

Страница 25: ...s 3 Under no circumstances should this appliance be operated without the front glass or with a broken glass Replacement of the glass with gasket as supplied by themanufacturershouldbedonebyalicencedqu...

Страница 26: ...ss Removal Section 2 Remove logs from the packaging As with all plastics these are not toys and should be kept away from children and infants 3 Place rear log BH2 on rear bracket ensure log is seated...

Страница 27: ...iodically perform a visual check of the pilot and the burner flames Compare them to the pictorials illustrated below Fig 61 62 and 63 If any of the flames appear abnormal call a service person INSPECT...

Страница 28: ...rame Removal in manual 8 Visibly locate pilot by the main burner 9 Turn knob on gas control counterclockwise to PILOT C Use only your hand to push in or turn the gas control knob Never use tools If th...

Страница 29: ...ADJUST PILOT FLAME HEIGHT ALL WIRING CONNECTIONS REPLACE THERMOPILE THERMOCOUPLE NEEDS A MINIMUM OF 14mV DEFECTIVE VALVE TURN TO PILOT METER SHOULD READ GREATER THAN 100 mV IF NOT REPLACE PILOT LIGHTS...

Страница 30: ...IEZO IGNITOR GENERATES SPARK ELECTRODE CABLE NOT GROUNDED PILOT STAYS ON FLAME ENGULFING THERMOCOUPLE BY 3 8 THERMOCOUPLE ATTACHED TO VALVE MNIMUM MILLIVOLT OPEN CIRCUIT 18MV CLOSED CIRCUIT 5MV VENT S...

Страница 31: ...w fittings 10001296 12 Manifold Tubing w fittings 57318 13 Thermocouple SIT 53373 14 Thermocouple PSE 10001825 15 Thermopile 51827 16 Electrode Ignitor w cable SIT 10001297 17 Ignitor Piezo SIT 52464...

Страница 32: ...CEMENT PARTS 27 26 24 25 22 4 a b 17 31 32 33 30 30 29 21 23 19 a b 5 a b 34 2 28 36 31 12 L O H I PILOT ADJ P I L O T ON OFF 20 a b 18 8 a b 3 6 a b 16 11 9 15 13 7 a b 10 15 14 1 COMPLETE LOG SET 1c...

Страница 33: ...ther box Black wire from supply should connect to the variable speed switch Alternate speed switch wire connects to temperature sensor Alternate lead from sensor connects to fan Alternate fan lead con...

Страница 34: ...SS TOP LOUVRE SPACERS SIDE PANEL SIDE PANEL BASE SIDE SUPPORTS BURNER TRAY LOG SUPPORT BACK PANEL SIDE TAB SIDE TAB BASE SIDE REFRACTORY BASE SIDE REFRACTORY FIREBOX BACK REAR LOG SUPPORT REFRACTORY B...

Отзывы: