manualshive.com logo in svg
background image

ZL0124-0E 

Page 14 of 20 

©2018 Veris Industries   USA 800.354.8556 or +1.503.598.4564  / [email protected] 0818 

 

Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Aerospond, Veris, and the Veris ‘V’ logo are trademarks or registered trademarks of  Veris Industries, L.L.C. in the USA and/or other countries.

Other companies’ trademarks are hereby acknowledged to belong to their respective owners.

TM

E50C1A Installation Guide

UI for Setup (cont.)

Next

Set Passwords:

SETUP -

The Password to enter the SETUP menu.

RESET -

The Password to enter the RESET menu.

RESET

--------

00000

SPASS

Setup

Passwords

SETUP

--------

00000

Back

To Setup p. 1 “S  PWR”

Max

PPS 

--------

1

2

5

10

20

50

Pulse

Output

Next

Set Pulse:

The System Type , CT size, PT Ratio, and System Voltage must 

all be configured before setting the Pulse Energy. If any of these 

parameters are changed, the meter will hunt for a new Pulse 

Duration, but will not change the Pulse Energy. If it cannot find a 

solution, the meter will display the wrench, show “ConF” in the 

ALARM -> PULSE screen, and enable Energy pulse output 

configuration error bit in the Modbus Diagnostic Alert Bitmap (if 

equipped).

Wh/P - Set Pulse Energy: 

In Watt Hours (& VAR Hours, if 

present) per Pulse. When moving down to a smaller energy, the 

meter will not allow the selection if it cannot find a pulse duration 

that will allow the pulse output to keep up with Theoretical 

Maximum System Power (see S_PWR screen). When moving 

up to a larger energy, the meter will jump to the first value where 

it can find a valid solution. 

mS/P – Minimum Pulse Duration Time: 

This read only value 

is set by the meter to the slowest duration (in mS per closure) 

that will keep up with the Theoretical Maximum System Power. 

The open time is greater than or equal to the closure time. The 

maximum Pulses Per Second (PPS) is shown in yellow.  

mS/P

--------

500

250

100

50

25

10

SPULS

Back

Wh/P

--------

10000

1000

100

10

SPLOS

Back

IMBAL

--------

0.25

Next

 VOLTS

--------

0.10

Set Phase Loss:

VOLTS - Phase Loss Voltage: 

The fraction of the system 

voltage below which Phase Loss Alarm is on. For system 

types with neutral, the Line to Neutral voltage is also 

calculated and tested. If the System Voltage is 600 and the 

fraction is set to 0.10, then the Phase Loss threshold will be 

60 volts.

IMBAL - Phase Loss Imbalance

: The fractional difference 

in Line to Line voltages above which Phase Loss Alarm is 

on. For system types with neutral, the Line to Neutral 

voltages are also tested. For system types 1+N (10) and 2 

(11) , imbalance is not tested. 

Phase

Loss

Back

 To

  SETU

P

To Setup page 1

† When leaving this parameter screen using the right button (  ), the display will 

briefly indicate “SAvEd)” to confirm that any changes made have been accepted.

Содержание E50C1A

Страница 1: ...nd if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications This device complies with part 15 of the FCC Rules Operation is subject to...

Страница 2: ...529 IP40 front display IP20 meter Display Characteristics Back lit blue LCD Terminal Block Screw Torque 0 37 to 0 44 ft lb 0 5 to 0 6 N m Terminal Block Wire Size 24 to 14 AWG 0 2 to 2 1 mm2 Rail T35...

Страница 3: ...Installation Guide Table of Contents Dimensions 4 Data Outputs 4 Product Diagram 5 Display Screen Diagram 5 Installation 6 Supported SystemTypes 7 Wiring Symbols 7 Wiring 8 Control Power 9 Quick Setu...

Страница 4: ...VerisIndustries L L C intheUSAand orothercountries Othercompanies trademarksareherebyacknowledgedtobelongtotheirrespectiveowners TM E50C1A Installation Guide Dimensions 4 2 107mm 3 6 91mm 1 5 39mm 2 3...

Страница 5: ...ndicator RS 485EquippedUnitsOnly TransmitData ReceiveData ReceiveDataError LCDScreen Buttons Up Select Right Next Down Select Left Back kWh 1234 5 Alarm Energy Two5 characterrows ofdisplaytext Toprowa...

Страница 6: ...35 mm DIN rail or screw mounted to the interior surface of the enclosure A DINRailMounting 1 Attach the mounting clips to the underside of the housing by sliding them into the slots from the inside Th...

Страница 7: ...r System Type will display as on the User Interface or as QNAN in the Modbus registers CTs Voltage Connections SystemType Phase Loss Measurements Wiring Diagram Number of wires Qty ID Qty ID Type Modb...

Страница 8: ...TnoPT UseSystemType11 2L UseSystemType12 2L 1n UseSystemType 31 3L UseSystemType10 1L 1n Wiring RISK OF ELECTRIC SHOCK OR PERMANENT EQUIPMENT DAMAGE CT terminals are referenced to the meter s neutral...

Страница 9: ...L L Outputto meetmeterinputrequirements DCControlPowerfrom125Vdcto300Vdc ULandCEmax FuseRecommendations Keep the fuses close to the power source obey local and national code requirements For selecting...

Страница 10: ...ect the parameter screen you want to set 6 After you set the parameters you want use or to select the next Setup screen or to exit the Setup screens return to SETUP B ToEnterModbuscommunicationparamet...

Страница 11: ...powered and no phase loss alarm conditions are present All pulse outputs and communication circuits are only intended to be connected to non hazardous circuits SELV or Class 2 Do not connect to hazar...

Страница 12: ...KWh Accumulated Real Energy Ph SETUP ALERT RESET Back Display nOnE if no alerts To Setup Setup Meter Reset Data Phase Loss A B C Low Power Factor A B C Frequency Out of Range A Current Over Range Vol...

Страница 13: ...00 SYSTM 3L 1n 3L 2L 1n 2L 1L 1n Back To SETUP Back Back Back S COM To Setup p 2 SPLOS Next S PT Set Potential Transfomer Ratio RATIO Potential transformer step down is RATIO 1 Default is 1 1 No PT in...

Страница 14: ...the selection if it cannot find a pulse duration that will allow the pulse output to keep up with Theoretical Maximum System Power see S_PWR screen When moving up to a larger energy the meter will jum...

Страница 15: ...47 k pull down to Shield RS 485 signal ground Wire the RS 485 bus as a daisy chain from device to device without any stubs Use 120 termination resistors at each end of the bus not included Shield is...

Страница 16: ...status 0x00 if the reset system is used bytes5 ID string Veris Industries E50xx Power Meter Full Data Set or Veris Industries E50xx Power Meter RESET SYSTEM RUNNING RSVersion x xxx last 2 bytes CRC 0x...

Страница 17: ...atio of 2 1 The default is 100 1 00 1 which is with no PT attached Set this value before setting the system voltage below 134 R W NV UInt 82 32000 SystemVoltage This voltage is line to line except for...

Страница 18: ...nd a pulse duration that will keep up with the max system power register 135 it will reject the new value Try a larger value kWh Pulse Contacts Note The kWh pulse contact can keep up with a maximum po...

Страница 19: ...nge Description 152 R W NV UInt 0 32767 Power Up Counter 153 R NV UInt 0 32767 Output Configuration E50C1 always returns 0 154 R UInt Reserved returns 0 Floating Point Data 257 258 R NV Float kWh Real...

Страница 20: ...ct connection to the same service PT polarity and adequate powering See theWiring Diagrams section for more information Cannot communicate with power meter from a remote personal computer Power meter...

Отзывы: