INSTALLATION MANUAL
DROP-ARM AWNING V124 - CALPE
12771999-19830EN
4
Subject to misprints, errors and technical modifications.
1.3 Drilling the hole for control
1. Precisely mark the hole where the cable of the control comes in.
- Cable: the hole needs to be marked at exactly the same height as the place where the cable leaves the box.
- Tape: the hole needs to be at least 50 millimeter below the box, exactly beneath the place where the tape
leaves the box.
2. Drill the hole for the wall throughput.
Always check the wall for piping or other obstacles! Use a board on the inside of the house to prevent damage
to the stuccowork.
- Wall throughput for tape: 20 millimeter (drill 10 millimeter, than 20 millimeter).
- Wall throughput for cable: 10 millimeter.
Figure 1.3 Installation of the wall support.
1.2 Drilling the holes
Drill the installation holes. Use matching plugs and bolts
of high quality. Install the wall supports (A) and tighten the
bolts. See figure 1.3.
1.4 Additional wall support (weak wall)
When there are fewer than five rows of stones above the installation location, an additional wall support needs to be used.
This additional wall support divides the forces over a bigger wall surface, the wall can than bear more weight.
See figure 1.4.
extra
Figure 1.4. Applying additional wall supports.