Veracity Coldstore CSTORE15-3U Скачать руководство пользователя страница 5

VERACITY 

COLDSTORE

  |  

CS

TORE

15-3U

 QUICK START GUIDE  | 

REV 3.0.

3

  |  

October 2018

  |  5 

 

We highly recommend that the unit is mounted into a rack for normal operation.

 

If rack-mounted, it is essential that the unit is mounted on a rack tray or shelf for support – it should not

be mounted on the rack-mount lugs alone.  

 

We highly recommend that the unit is mounted in the rack (or if not to be rack mounted, placed in the

desired location) before any disks are inserted.  The unit is quite heavy when empty, but very heavy when fully 
populated with hard disks.  Therefore, care should be taken when lifting the unit, and this is best done before 
the disks are fitted.  This also removes the risk of physical shock damage to hard disks when moving the unit 
into place.  (See section M), Disk Management – Adding & Removing Disks, below). 

G) System Connections

Once properly located, the power and network cables can be prepared ready for connection. However,
at this stage, do not switch on the power. See rear panel photo below for location of connectors.

Steps:

1

 

Connect a network cable from your network switch to the network port labelled ETH1.

2

 

Connect two power cables to the unit, but do not switch the unit on.

 

If network connection redundancy is required, a second network cable can be connected between your

network switch and the network port labelled ETH2 but before connecting ensure that the COLDSTORE has
been configured to support redundancy.

The digital I/O connections are not covered in this Quick Start Guide – see COLDSTORE User’s Guide. 

H) Disk Loading

COLDSTORE is delivered with 15 lockable disk trays.  To remove
a tray, slide the top section of the tray upwards, releasing the
lower section.  Pull the lower section down and outwards (as
illustrated) and gently slide the tray out.

Any make, model or size of SATA hard disk may be used in
COLDSTORE.  For optimum use of disk space, we recommend
that all disks be of identical capacity.  Load the disks into the
trays using the mounting screws provided.  Use four screws per
disk for secure mounting.

COLDSTORE requires at least two disks for set up and configuration. A minimum of three disks are
required for typical operation (normal COLDSTORE mirrored overlapping-pair mode).

 

Ensure the system has not yet been switched on before mounting the first disks – the COLDSTORE start

up procedure requires disks to be present for full boot-up and normal operation.  If the system has been
switched on in error, simply switch the unit off before proceeding.  Note that further disks can be added later
while the system is running.

Содержание Coldstore CSTORE15-3U

Страница 1: ...Quick Start GUIDE COLDSTORE CSTORE15 3U Version 3 0 3...

Страница 2: ...Overview F Chassis Mounting G System Connections H Disk Loading I Power Up Sequence J Front Panel Menu K COLDSTORE Set up and Maintenance Software SITESCAPE Installing SITESCAPE Getting Connected L Sy...

Страница 3: ...t No 2009 502184 The storage array should NOT be moved once powered up as this is very likely to cause disk damage this applies to all types of disk storage arrays Information in this guide is subject...

Страница 4: ...running Windows 7 or later Windows operating system Ethernet Network including network cables and a switch Preferred Video Management System see website for list of supported systems E System Overview...

Страница 5: ...unit on If network connection redundancy is required a second network cable can be connected between your network switch and the network port labelled ETH2 but before connecting ensure that the COLDS...

Страница 6: ...acity s technical support team Fitting 2 5 disk drives to the rear drive bays will not provide performance benefits and could the correct operation of the COLDSTORE I Power Up Sequence Once the disks...

Страница 7: ...the configuration of your firewall and ensure that the SITESCAPE has full unblocked network access For more information about installing and using SITESCAPE see COLDSTORE User s Guide Installing SITE...

Страница 8: ...have two Ethernet connections labelled ETH1 and ETH2 By default connection ETH1 has IP address 10 0 0 140 subnet mask 255 255 255 0 and gateway 10 0 0 1 This section assumes that the network settings...

Страница 9: ...ORE tab If a warning dialog or other notification is shown by a network firewall protection application choose to allow the SITESCAPE application full access to the network 8 Click the COLDSTORES tab...

Страница 10: ...RE is eventually listed but with status offline and with error Device not found and a manually entered IP address for the COLDSTORE was used then it is possible that SITESCAPE is being prevented from...

Страница 11: ...correct and are writable See COLDSTORE User s Guide gives full details of all operations possible with SITESCAPE Correct time sync may be essential for correct operation depending upon application It...

Страница 12: ...at protocol 7 Click the IPV4 protocol tab The IPV4 Protocol tab for ETH1 connection of the selected COLDSTORE is shown 8 Enter the network settings in IPV4 format as required for your installation Upd...

Страница 13: ...the installation s network switch The SITESCAPE application can then be used to search for and add all the COLDSTORE devices on the installation s network to My Site SITESCAPE can then be used to ful...

Страница 14: ...in the array it may already have been faulty or may have been handled incorrectly during assembly It is essential that all disks are handled carefully are not dropped or even knocked against hard obje...

Отзывы: