MAINTENANCE
The crane requires only periodic lubrication. As a standard procedure, this can be done at the time the vehicle is serviced.
GENERAL
Inspect wire rope for any evidence of kinks or fraying. Ensure that lifting hook of wire rope shows no evidence of damage
and is functioning normally.
Inspect headache ball ("load block") for any signs of damage or excessive wear.
Service all grease fitting locations.
Inspect hydraulic hoses and hydraulic fittings for hydraulic leaks.
Inspect electrical connections for any looseness or corrosion.
Inspect bolts and verify all are tight, paying particular attention to winch, rotation system, and mounting base bolts.
Inspect all pins and snap rings for proper fit and function.
Inspect sheaves for excessive wear or play.
WINCH
Perform a basic inspection of the winch with each use, monitoring for unusual noise or hydraulic leaks.
The winch planetary gearbox lube (SAE 90) should be maintained at the level plug (final base relief valve port) which is
approximately half-full point.
To ensure optimal winch performance, the following oil change schedule should be followed:
Initial Change - after the initial 100 hours of operation or two months.
Periodic Change - after every 1000 hours of operation or two years
.
MAINTENANCE OVERVIEW INFORMATION
Содержание HT45KX-30
Страница 2: ......
Страница 4: ...SECTION 100 DESCRIPTION SPECIFICATIONS 7607100A...
Страница 8: ...SECTION 150 SAFETY 8604150...
Страница 18: ...SECTION 200 INSTALLATION 7607200A...
Страница 34: ...SECTION 300 MAINTENANCE SERVICE 7607300A...
Страница 37: ...SECTION 400 PARTS 7607400A...
Страница 59: ......