SAFETY
Before operating this crane, read and understand these instructions, the 920612 Crane Safety and Hazards
Information Sheet, and review all safety & instruction labels on the crane
.
CRANE INSPECTION
Before operating this crane, inspect for wear, damage, or oil leakage. After the wire rope has been run out,
check for wear, kinks, and broken strands. Check the hook and safety latch for damage. Correct any
problems before using the crane.
See Crane Safety Manual for proper inspection schedules and reports
.
CAPACITY
Before operating this crane, review the capacity charts on the sides of the boom to relate the load to be lifted
to the boom length and angle. The boom angle is shown by a gravity arrow.
LOAD BLOCK
If the load exceeds 3000 lbs. -HT40 Series, or 4000 lbs. -HT50 series, or if reduced winching speed for better
control of smaller loads is required, use the load block to rig the crane for two part line operation
.
CONTROLS
This crane is operated by a radio-controlled pendant. The pendant should be unplugged and stored in a
compartment when the crane is not in use.
Before activating the pendant, inspect the receiver, cord(s), and pendant head/switches for damage. Actuate
all switches in both directions to verify that they all have the same feel and sound, and that they return to the
center position.
PTO SYSTEM
Check the hydraulic fluid level in the PTO system reservoir. Engage PTO and set the engine idle speed to
provide the desired hydraulic flow rate per the PTO system instructions. A lower idle setting may be used for
more delicate spotting of loads if required.
CRANE OPERATION
Use "Winch Down" to release tension on the wire rope to unhook it from the storage tie down position.
Use "Boom Up" to elevate the boom from the boom rest position.
Avoid repeated rapid reversals of the control switches. This can cause the load to swing.
Check all control functions to see that they are working as described in the following section.
CRANE OPERATION AND MAINTENANCE INSTRUCTIONS, PAGE 1
HT40/50 VLC SERIES
Содержание HT45KX-30
Страница 2: ......
Страница 4: ...SECTION 100 DESCRIPTION SPECIFICATIONS 7607100A...
Страница 8: ...SECTION 150 SAFETY 8604150...
Страница 18: ...SECTION 200 INSTALLATION 7607200A...
Страница 34: ...SECTION 300 MAINTENANCE SERVICE 7607300A...
Страница 37: ...SECTION 400 PARTS 7607400A...
Страница 59: ......