background image

2

www.ventilation-system.com

VUT/VUE 180 P5(B) (EC)

CONTENTS

Safety requirements ..................................................................................................................................................................... 2
Purpose ................................................................................................................................................................................................ 4
Delivery set ........................................................................................................................................................................................ 4
Designation key .............................................................................................................................................................................. 4
Technical data .................................................................................................................................................................................. 5
Unit design and operating principle ................................................................................................................................. 6
Installation and set-up................................................................................................................................................................ 8
Connection to power mains .................................................................................................................................................. 12
Unit control ....................................................................................................................................................................................... 13
Technical maintenance .............................................................................................................................................................. 14
Storage and transportation regulations .......................................................................................................................... 16
Manufacturer’s warranty ........................................................................................................................................................... 17
Certificate of acceptance .......................................................................................................................................................... 18
Seller information .......................................................................................................................................................................... 18
Installation certificate .................................................................................................................................................................. 18
Warranty card ................................................................................................................................................................................... 18

This user’s manual is a main operating document intended for technical, maintenance, and operating staff.
The manual contains information about purpose, technical details, operating principle, design, and installation of the VUT/VUE 180 P5(B) (EC) 
unit and all its modifications.
Technical and maintenance staff must have theoretical and practical training in the field of ventilation systems and should be able to 
perform works in accordance with workplace safety rules as well as construction norms and standards applicable in the territory of the 
country.
The information in this user’s manual is correct at the time of the document’s preparation.  
The Company reserves the right to modify the technical characteristics, design, or configuration of its products at any time in order to 
incorporate the latest technological developments.
No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means in any information 
search system or translated into any language in any form without the prior written permission of the Company.

SAFETY REQUIREMENTS

•  Please read the user’s manual carefully prior to installing and operating the unit.
•  All user’s manual requirements as well as the provisions of all the applicable local and national construction, electrical, and technical 

norms and standards must be observed when installing and operating the unit.

•  The warnings contained in the user’s manual must be considered most seriously since they contain vital personal safety information.
•  Failure to follow the rules and safety precautions noted in this user’s manual may result in an injury or unit damage.
•  After a careful reading of the manual, keep it for the entire service life of the unit.
•  While transferring the unit control, the user’s manual must be turned over to the receiving operator.

UNIT INSTALLATION AND OPERATION SAFETY PRECAUTIONS

•  Disconnect the unit from power mains prior 

to any installation operations.

•  The unit must be grounded!

•  Do not lay the power cable of the unit in 

close proximity to heating equipment.

•  While installing the unit, follow the safety 

regulations specific to the use of electric 
tools.

Содержание VUE 180 P5 EC

Страница 1: ...VUT 180 P5 VUE 180 P5 VUT 180 P5 EC VUE 180 P5 EC VUT 180 P5B EC VUE 180 P5B EC Air handling unit USER S MANUAL...

Страница 2: ...e in order to incorporate the latest technological developments No part of this publication may be reproduced stored in a retrieval system or transmitted in any form or by any means in any information...

Страница 3: ...ldren to operate the unit Disconnect the unit from power mains prior to any technical maintenance Do not store any explosive or highly flammable substances in close proximity to the unit When the unit...

Страница 4: ...substances toxic substances dust pathogenic germs The relative humidity of the transported air at a temperature of 20 C should not exceed 80 DELIVERY SET NAME NUMBER Air handling unit 1 pc User s manu...

Страница 5: ...anual TECHNICAL DATA MODEL VUT 180 P5 B VUE 180 P5 B VUT 180 P5 VUE 180 P5 Voltage V 50 60 Hz 1 220 240 Maximum fan power W 87 117 Maximum unit current without a heater A 0 71 0 54 Maximum air flow m3...

Страница 6: ...at exchanger Bypass damper Supply filter F7 Supply filter G4 The service side of the unit is equipped with detachable plates fixed by screws for filter cleaning and replacement operations The control...

Страница 7: ...to the cold fresh air The air flows are fully separated while flowing through the heat exchanger Heat recovery minimizes heat losses which reduces the cost of space heating in the cold season SUPPLY A...

Страница 8: ...t air duct length equal to 1 air duct diameter on intake side equal to 3 air duct diameters on outlet side If the air ducts are too short or not connected protect the unit parts from ingress of foreig...

Страница 9: ...Fasteners for unit mounting should be selected by the Customer Service technician Unscrew the thumbscrews on the unit before attaching it to the mounting brackets Set the unit thumbscrews into the ma...

Страница 10: ...pes is in the cover of the unit Remove the plug from the hole open the service panel and install the drain pipe from the delivery set into the hole The drain pipes should be installed only in the hole...

Страница 11: ...ach drain pipe is connected to a different U trap min 3 Drain hose U trap Sewage system Drain pipe The condensate drainage system is designed for normal operation in premises with air temperatures abo...

Страница 12: ...Y THE POWER CABLE OF THE UNIT IN CLOSE PROXIMITY AND PARALLEL TO THE CONTROL PANEL CABLE DO NOT COIL THE CONTROL PANEL CABLE WHILE LAYING ITS OUT External control units wiring diagram for units with a...

Страница 13: ...3 230 V 50 60 Hz Designation Name Wire P1 Control panel 4 x 0 75 mm2 Designation Name Wire P1 Control panel 6 x 0 6 mm2 External control units wiring diagram for units with an A21 control panel GND 24...

Страница 14: ...To clean or replace the filters remove the detachable plates located on the service side of the unit After cleaning install the filters and the detachable plates in the reverse order 2 Heat exchanger...

Страница 15: ...ctly otherwise troubleshoot the connection error The motor is jammed the impeller blades are clogged Turn the unit off Troubleshoot the motor jam and the impeller clogging Clean the blades Restart the...

Страница 16: ...table hoist machinery for handling and storage operations to prevent possible damage to the unit Follow the handling requirements applicable for the particular type of cargo The unit can be carried in...

Страница 17: ...ing cases User s failure to submit the unit with the entire delivery package as stated in the user s manual including submission with missing component parts previously dismounted by the user Mismatch...

Страница 18: ...18 www ventilation system com VUT VUE 180 P5 B EC...

Страница 19: ...ual The warranty terms are acknowledged and accepted Customer s Signature The VUT VUE 180 P5___ EC A____ unit has been connected to power mains pursuant to the requirements stated in the present user...

Страница 20: ...V170EN 03...

Отзывы: