11
www.ventilation-system.com
Drain pipe
Plug
Drain hole location in case of installation according to the Diagram 1
Then connect the drain pipe to the sewage system using the SG-32 U-trap kit (available upon separate order). The pipes are required to
have a minimum slope of 3°. Each drain pipe is connected to a different U-trap.
min 3°
Drain hose
U-trap
Sewage system
Drain pipe
The condensate drainage system is designed for normal operation in premises with air temperatures above 0 °C! If the expected ambient
air temperatures are below 0 °C, the condensate drainage system must be equipped with heat insulation and pre-heating facilities.
Condensate drainage is not required for the VUE 180 P5(B) (EC) units as they are equipped with an enthalpy heat exchanger.
Содержание VUE 180 P5 EC
Страница 18: ...18 www ventilation system com VUT VUE 180 P5 B EC...
Страница 20: ...V170EN 03...