All adjustments on the machine have been made in the factory.
9
NO LOAD TESTS
Before putting into service the machine, run at least one no load test in order to verify the absence
of anomalies.
Before carrying out the operations under load, carry out an empty test in order to
check for any anomalies in particular in the direction of rotation of the motors, etc.
Connect only the high pressure hose to the gun and turn on the machine and
operate the
gun for a few minutes, to facilitate the escape of any processing residues.
10
LOAD TESTS
Run at least one load test in order to verify absence of anomalies.
Carry out at least one load test in order to verify the absence of anomalies.