Fixed washing plant
MODULA PLUS 2
Draft Vema Srl
26
4
DESCRIPT
ION
OF T
HE
MA
CHINE
3
PROVISIONS
Provisions for installation
For installation, it is necessary to arrange a manoeuvre area appropriate for the machine size and
for the chosen lifting systems.
Machine arrangement must ensure optimal workspace ergonomics and safety: leave around the
machine a proper area for an easy use and handling of materials and for maintenance and
adjustment.
Connection instructions for electrical system
Connection to the electrical system for power supply and synchrony with other machines must be
carried out by specialized and skilled personnel in accordance with the electrical diagram and the
provisions of current laws and/or technical regulations about workplace safety and electrical
installations.
To achieve a proper degree of safety, the electrical system connected to the machine must be
equipped by the customer with:
▪
earthing system in accordance with local regulations;
▪
any other measures for the proper putting into service in accordance with current laws and
technical regulations about workplace safety and electrical installations.
Such arrangements shall be made always by the customer on his own
responsibility.
The manufacturer is not responsible for damage to people, animals and/or
things caused by failure to comply with such provisions.
4
ASSEMBLY
The procedures for machine assembly or indicate if the machine is delivered partially
assembled by the customer and the final assembly was made by manufacturer.