VTSDIR
21.03.2011
©
Velleman nv
5
6.
Setup
Refer to the illustrations on page
2
of this manual.
Note:
never
unplug any connection during operation.
•
The equipment must be sited on a firm surface at least 1.2M x 0.75M and at a height to suit the operator.
The location should be chosen to suit the flow of work.
•
Plug the solder light plug into the socket on the front of the main station.
•
Plug the solder light fan into the cooling fan socket
[18]
and place the solder light in the holder.
•
Plug the footswitch into the foot switch socket
[17]
.
•
The quartz heaters are secured against shocks with a metal bar and plastic tubes. Remove these and mount
the metal grid in place (refer to Appendix 1).
•
Mount the PCB holder (refer to Appendix 2).
•
Plug the power cord into the AC power inlet
[21]
.
7.
Operation
•
The principle of operation of IR rework system is that whilst being heated from above and below, a single
SMD is subjected to similar temperature/time profile during rework as it experiences during reflow in the
original production process.
Note:
wait about 5 minutes for the system to warm up after changing a setting.
IR hand tool operation:
•
Set the “SOLDERLIGH/TIMER” switch
[1]
to the SOLDERLIGHT position (I).
•
Set the IR Lamp temperature using the “
▼
”
[3]
and “
▲
”
[4]
keys. Press and hold ±2s to increase
setting speed. Read the temperature on the display
[5]
.
Note:
the temperature depends on the type of work (normally about 240°C)
Standard operation
•
Press on the footswitch to start the IR heating; release to stop IR heating.
Timer-up operation
•
Set the “SOLDERLIGH/TIMER” switch
[1]
to the TIMER position (O).
•
Set the “Time counting” switch
[2]
to the UP position (I).
•
Press on the footswitch to start IR heating; release to stop IR heating. The timer display
[9]
will count
the number of seconds that the IR heating was on.
Timer-down operation
•
Set the “SOLDERLIGH/TIMER” switch
[1]
to the TIMER position (O).
•
Set the “Time counting” switch
[2]
to the DOWN position (O).
•
Set the timer using the “
▼
”
[3]
and “
▲
”
[4]
keys. Press and hold ±2s to increase setting speed. Read
the time (in seconds) on the display
[9]
.
•
Press on the footswitch to start IR heating; release to stop IR heating. The timer display will count
down the number of seconds that the IR heating was on. When 000 is reached, a warning signal
sounds.
Notes:
•
Press the reset switch
[8]
to return the display to 000.
•
To determine the reflow time of a new component, first use the timer up operation until it reflows, than
use the timer value for timer-down operation.
Pre-heater operation:
•
Set the pre-heater temperature using the “
▼
”
[12]
and “
▲
”
[11]
keys. Press and hold ±2s to increase
setting speed. Read the temperature on the display
[16]
.
Note:
the temperature depends on the type of work (normally about 220°C)
Actual temperature compensation value
•
Press on the MODEL button
[13]
until the display shows “---” (±4s). The temperature compensation is
shown for ±2s.
•
To change the value, press the MODEL button
[13]
again. The value on the display starts to flash and
can be set using the “
▼
”
[12]
and “
▲
”
[11]
keys.
Note:
when the display shows “00” or “-00” the compensation is “+10”.
E.g. When the temperature is set at 200°C and the measured temperature is only 190°C, then the
value must be set to “00” or “-00”. If the measured value is 180°C, than the compensation value must
be set to “+10” (-20 + 10 = 10).
General operation:
CAUTION:
to avoid burns, do not touch the heater or PCB directly, use clips or tweezers to pick up or align
components.
CAUTION:
do not allow water/liquids/solvents to touch the heater surface to avoid temperature drop cracks
while the unit is still hot. Such cracks can lead to electrical shorts or failure of the heater.
CAUTION:
Do not touch the PCB holder to avoid burning your skin during preheat!
Содержание VTSDIR
Страница 1: ...V IN US VTSD NFRA RE SER MAN DIR ED SMD UAL BGA RE EWORK S 3 STATION N ...
Страница 2: ...VTSDIR 21 03 2011 Velleman nv 2 Main station front panel Main station rear panel Figure ...
Страница 9: ...VTSDIR 21 03 2011 Velleman nv 9 Place the metal grid and secure it with the two screws X ...
Страница 10: ...VTSDIR 21 03 2011 Velleman nv 10 Appendix 2 ...
Страница 11: ...VTSDIR 21 03 2011 Velleman nv 11 ...