background image

VTSDIR 

21.03.2011 

©

Velleman nv 

5

6.

 

Setup 

Refer to the illustrations on page 

of this manual. 

Note:

 

never

 unplug any connection during operation.

 

 

The equipment must be sited on a firm surface at least 1.2M x 0.75M and at a height to suit the operator. 
The location should be chosen to suit the flow of work. 

 

Plug the solder light plug into the socket on the front of the main station.  

 

Plug the solder light fan into the cooling fan socket 

[18]

 and place the solder light in the holder. 

 

Plug the footswitch into the foot switch socket 

[17]

 

The quartz heaters are secured against shocks with a metal bar and plastic tubes. Remove these and mount 
the metal grid in place (refer to Appendix 1). 

 

Mount the PCB holder (refer to Appendix 2). 

 

Plug the power cord into the AC power inlet 

[21]

.  

7.

 

Operation 

 

The principle of operation of IR rework system is that whilst being heated from above and below, a single 
SMD is subjected to similar temperature/time profile during rework as it experiences during reflow in the 
original production process. 

Note: 

wait about 5 minutes for the system to warm up after changing a setting. 

IR hand tool operation:  

 

Set the “SOLDERLIGH/TIMER” switch 

[1] 

to the SOLDERLIGHT position (I).  

 

Set the IR Lamp temperature using the “

” 

[3] 

and “

” 

[4] 

keys. Press and hold ±2s to increase 

setting speed. Read the temperature on the display 

[5]

Note: 

the temperature depends on the type of work (normally about 240°C) 

Standard operation 

 

Press on the footswitch to start the IR heating; release to stop IR heating. 

Timer-up operation 

 

Set the “SOLDERLIGH/TIMER” switch 

[1] 

to the TIMER position (O). 

 

Set the “Time counting” switch 

[2] 

to the UP position (I).  

 

Press on the footswitch to start IR heating; release to stop IR heating. The timer display 

[9] 

will count 

the number of seconds that the IR heating was on. 

Timer-down operation 

 

Set the “SOLDERLIGH/TIMER” switch 

[1] 

to the TIMER position (O). 

 

Set the “Time counting” switch 

[2] 

to the DOWN position (O).  

 

Set the timer using the “

” 

[3] 

and “

” 

[4] 

keys. Press and hold ±2s to increase setting speed. Read 

the time (in seconds) on the display 

[9]

 

Press on the footswitch to start IR heating; release to stop IR heating. The timer display will count 
down the number of seconds that the IR heating was on. When 000 is reached, a warning signal 
sounds. 

Notes: 

 

Press the reset switch 

[8]

 to return the display to 000. 

 

To determine the reflow time of a new component, first use the timer up operation until it reflows, than 
use the timer value for timer-down operation. 

Pre-heater operation:  

 

Set the pre-heater temperature using the “

” 

[12] 

and “

” 

[11] 

keys. Press and hold ±2s to increase 

setting speed. Read the temperature on the display 

[16]

Note: 

the temperature depends on the type of work (normally about 220°C) 

Actual temperature compensation value 

 

Press on the MODEL button 

[13] 

until the display shows “---” (±4s). The temperature compensation is 

shown for ±2s. 

 

To change the value, press the MODEL button 

[13]

 again. The value on the display starts to flash and 

can be set using the “

” 

[12] 

and “

” 

[11] 

keys.  

Note: 

when the display shows “00” or “-00” the compensation is “+10”.  

E.g. When the temperature is set at 200°C and the measured temperature is only 190°C, then the 
value must be set to “00” or “-00”. If the measured value is 180°C, than the compensation value must 
be set to “+10” (-20 + 10 = 10). 

General operation:  

CAUTION:

 to avoid burns, do not touch the heater or PCB directly, use clips or tweezers to pick up or align 

components.  

CAUTION: 

do not allow water/liquids/solvents to touch the heater surface to avoid temperature drop cracks 

while the unit is still hot. Such cracks can lead to electrical shorts or failure of the heater.  

CAUTION: 

Do not touch the PCB holder to avoid burning your skin during preheat!  

 

 

Содержание VTSDIR

Страница 1: ...V IN US VTSD NFRA RE SER MAN DIR ED SMD UAL BGA RE EWORK S 3 STATION N ...

Страница 2: ...VTSDIR 21 03 2011 Velleman nv 2 Main station front panel Main station rear panel Figure ...

Страница 3: ...g th work BGA re ut first cons children Yo re to take t Always conne rd Be sure t uids or other e mains befo Death or se re nor use th move the AC eriod of time sed for sold manufacturer r intermitte hould be use back in its co le it is in the hand tool o your eyes s as serious VTSDIR 3 er man this produc e indicates th f the unit or cycling This ocal environ disposal au e manual tho r use it and ...

Страница 4: ...ture ng alloys use this type of s equirements king tempera f heat Do n n as burning ommencing m sult from el commencing y liquid to fa cal compone n and unaut d Quality W p this device from dust an shocks and ons of the de forbidden fo nty d purpose U rtain guidelin y for any ens this manual witch I So ounting up temperature temperature d tool power degrees Cels in degrees F for TIMER display Proc...

Страница 5: ... count the number of seconds that the IR heating was on Timer down operation Set the SOLDERLIGH TIMER switch 1 to the TIMER position O Set the Time counting switch 2 to the DOWN position O Set the timer using the 3 and 4 keys Press and hold 2s to increase setting speed Read the time in seconds on the display 9 Press on the footswitch to start IR heating release to stop IR heating The timer display...

Страница 6: ...r temperature herefore we seconds for soak about nent to cool e PCB holder pply a very s mponent PCB nd tool oper temperature herefore we ds for a smal soak about onent to coo cessary use al setting is IR Hand too reworking a g motion to se al setting is VTSDIR 6 GA componen mponent ering desold through a p de and mixe eflective cha gy is proved re below sho older positio ply a very sm te dependi ...

Страница 7: ...s not so easy to measure temperature during the reflow phase so therefore we use the electronic process timer to warn us when the reflow phase time is over 9 Technical specifications mains power 230VAC IR solderlight power 150W temperature range 45 350 C time setting 0 900s pre heater power 650W temperature range 100 350 C dimensions controller 170 x 158 x 137 mm pre heater 280 x 90 x 260 mm weigh...

Страница 8: ...VTSDIR 21 03 2011 Velleman nv 8 Appendix 1 Remove screws X remove metal bar Y and remove plastic tubes Z ...

Страница 9: ...VTSDIR 21 03 2011 Velleman nv 9 Place the metal grid and secure it with the two screws X ...

Страница 10: ...VTSDIR 21 03 2011 Velleman nv 10 Appendix 2 ...

Страница 11: ...VTSDIR 21 03 2011 Velleman nv 11 ...

Страница 12: ...t or indirect damage caused after delivery to the article e g by oxidation shocks falls dust dirt humidity and by the article as well as its contents e g data loss compensation for loss of profits frequently replaced consumable goods parts or accessories such as batteries lamps rubber parts drive belts unlimited list flaws resulting from fire water damage lightning accident natural disaster etc fl...

Отзывы:

Похожие инструкции для VTSDIR