l
D
igital input
4
-
R
elay
4
I
f the pump monitoring for a relay was switched on
,
a timer is started
when the relay is switched on
(
time allowance with parameter
"
R
eport
time
"
).
I
f the checkback signal comes from the pump on the respective
digital input within the de
fi
ned report time
,
the pump relay remains
energized
,
otherwise the relay is immediately switched o
ff
and a fault
signal outputted
.
A
fault signal and switching o
ff
of the relay is carried
out even if the relay is already switched on and the pump checkback
signal changes during the running time of the pump
.
I
n addition
,
a
switched o
ff
relay of the pump control is looked for and switched on
instead of the disturbed relay
.
A L
ow signal on the digital input is
processed as a pump error signal
.
T
o reset a pump control
,
you can
execute the pump failure reset for the respective relay in the menu
"
E
xtended settings
-
R
eset
"
.
S
witch on reaction of the pump control
2
A
fter the signal conditioning instrument is switched on
,
the relays are
still in switched
-
o
ff
condition
.
D
epending on the input signal and the
switch
-
on period of the individual relays
,
the following relay switching
conditions can occur after the start procedure
:
l
I
nput signal is higher than the upper switching point
-
>
R
elay with
the shortest switch on period is switched on
l
I
nput signal is between lower and upper switching point
-
>
R
elay
remains switched o
ff
l
I
nput signal is smaller than the lower switching point
-
>
R
elay
remains switched o
ff
8
.
3
P
ump control
3
/
4
(
sequentially controlled
)
P
ump control
3
/
4
is used to control several pumps with the same
function alternately and in a
fi
xed sequence
.
I
n case of an increased
requirement
,
all pumps can run at the same time depending on the
entered switching points
.
W
ith this measure
,
a steady utilization of the
pumps is reached and the reliability increased
.
A
ll relays with activated pump control are not assigned to a certain
switching point but are switched on and o
ff
alternately
.
T
he signal
conditioning instrument selects when reaching a switching on point
,
the relay which is next in the sequence
.
W
hen reaching a switching o
ff
point
,
the relays are switched o
ff
in the sequence they were switched
on
.
P
robable failures of the pumps can be processed in addition via the
digital inputs
.
W
ith this pump control
,
there are two di
ff
erent versions
:
l
P
ump control
3
:
T
he upper switching point determines the switch
-
o
ff
point for the relay
,
whereas the lower switching point
determines the switch
-
on point
l
P
ump control
4
:
T
he upper switching point determines the switch
-
on point for the relay
,
whereas the lower switching point
determines the switch
-
o
ff
point
F
unctional principle
44
VEGAMET
391
•
4
…
20
m
A
/
HART
signal conditioning instrument
8
A
pplication examples
36032
-
EN
-
091116
Содержание VEGAMET 391
Страница 65: ...VEGAMET 391 4 20 mA HART signal conditioning instrument 65 Index 36032 EN 091116 ...
Страница 66: ...66 VEGAMET 391 4 20 mA HART signal conditioning instrument Index 36032 EN 091116 ...
Страница 67: ...VEGAMET 391 4 20 mA HART signal conditioning instrument 67 Index 36032 EN 091116 ...