C
aution
:
M
ake sure that the two components of the double washer remain
together
.
4
S
crew in a new measuring part manually
5
E
xert counterforce with the second fork spanner and tighten the
measuring component on the
fl
at surfaces with a torque of
15
N
m
(
11
lbf ft
).
F
ig
.
27
:
E
xchanging the cable or rod
I
nformation
:
P
lease keep the stated torque so that the max
.
tensile strength
remains
.
T
he cable and rod of the probe can be shortened by any amount
.
1
C
able
:
loosen the three pins on the gravity weight
(
hexagon
4
)
2
C
able
:
remove the pins
3
C
able
:
P
ull the cable out of the gravity weight
4
S
horten the cable
/
rod with a cut
-
o
ff
wheel or metal saw at the
lower end
.
M
ake sure the length is correct
.
5
C
able
:
cable protrudes approx
.
65
mm
(
2
.
4
in
)
into the gravity
weight
.
6
C
able
:
F
asten the cable with three pins
,
torque
20
N
m
(
14
.
75
lbf in
)
7
E
nter new probe length and then carry out a fresh adjustment
(
see
"
S
etup procedure
,
C
arrying out min
.
adjustment
-
C
arrying out
max
.
adjustment
"
).
S
horten cable
/
rod
46
VEGAFLEX
62
•
4
…
20
m
A
/
HART
two
-
wire
8
M
aintenance and fault recti
fi
cation
31837
-
EN
-
090831