background image

Table of Contents

iv

Figures

Figure 1.

Maxxum® Packer-Manifold Assembly ....................................................8

Figure 2.

Conduit Box - Yoke Assembly

................................................................9

Figure 3.

Representative Wiring Diagram, Three-Phase, Two-Wire Control...........11

Figure 4.

Three-Wire, Three-Phase Motor Wiring Diagram .................................12

Figure 5.

Equipotential Bonding Terminal ............................................................13

Figure 6.

Installation Dimensions .........................................................................14

Figure 7.

Floating Suction Installation ..................................................................16

Figure 8.

Installing A Big Flo Diaphragm Valve

...................................................17

Figure 9.

Installing A Siphon And Vacuum Lines .................................................18

Figure 10.

Tandem Pumps

....................................................................................19

Figure 11.

Suggested Diagram for Wiring Dual Manifold System, 
Two-Wire Control, Three Phase

...........................................................20

Figure 12.

Suggested Diagram for Wiring Dual Manifold System, 
Three-Wire Control, Three Phase .........................................................21

Figure 13.

Maxxum Packer-Manifold Assembly: Line and Tank Testing ...............22

Figure 14.

Pressurstat - Pressure Adjustment .......................................................23

Figure 15.

Maxxum® - Extractable Section Showing ‘FM’ On Nameplate .............25

Figure 16.

UMP - Discharge Head Assembly

........................................................28

Figure 17.

Maxxum® Check Valve Assembly ........................................................29

Figure 18.

Pressurstat and Check Valve Lock-Down Screw Assembly .................31

Figure 19.

Check Valve and Pressurstat Assembly ...............................................32

Figure 20.

Check Valve and Electrical Bushing Assembly

....................................33

Figure 21.

Maxxum® Packer-Manifold Assembly ..................................................34

Figure 22.

Maxxum® Yoke and Contractors Box Assembly ..................................35

Tables

Table 1. 

Minimum Recommended ByPass Flow .....................................................6

Table 2. 

Pump Length Requirements ....................................................................15

Table 3. 

Winding Resistances ...............................................................................15

Table 4. 

Electrical Service Information ..................................................................16

Table 5. 

UMP - Discharge Head Assembly Repair Parts ......................................28

Table 6. 

Check Valve and Pressurstat Assembly Repair Parts  ............................32

Table 7. 

Check Valve/Electrical Bushing Assembly Repair Parts  .........................33

Table 8. 

Packer-Manifold Repair Parts  .................................................................34

Table 9. 

Yoke Assembly Repair Parts ...................................................................35

Table 10. 

Replacement Pump Motors .....................................................................36

Table 11. 

Magnetic Starter Information  ...................................................................36

Содержание Maxxum Big-Flo 6

Страница 1: ...Manual No 577014 089 Revision F Maxxum Big Flo 6 Submersible Pump Installation Operation and Service Red Jacket Submersible Pump...

Страница 2: ...of Lading to V R Customer Service at 800 234 5350 2 Call V R Customer Service at 800 873 3313 with the specific part numbers and quantities that were received damaged or lost 3 VR will file the claim...

Страница 3: ...ation Information 16 Installing A Big Flo Diaphragm Valve 17 Attaching the Siphon and Vacuum Lines with Factory Installed Siphon Assemblies 18 Installing Two Pumps for Tandem Operation 19 Testing the...

Страница 4: ...Pressurstat Pressure Adjustment 23 Figure 15 Maxxum Extractable Section Showing FM On Nameplate 25 Figure 16 UMP Discharge Head Assembly 28 Figure 17 Maxxum Check Valve Assembly 29 Figure 18 Pressurs...

Страница 5: ...f not avoided could result in minor or moderate injury GLOVES Wear gloves to protect hands from irritation or injury NOTICE is used to address practices not related to physical injury WEAR EYE PROTECT...

Страница 6: ...procedures before beginning work Make sure your employees and any service contractors read and follow the instructions Follow the Regulations Applicable information is available in National Fire Prot...

Страница 7: ...ical power to the pump dispenser This means that even if you press a button on the console labeled EMERGENCY STOP ALL STOP PUMP STOP or something similar fuel may continue to flow uncontrolled Hazardo...

Страница 8: ...rfill or top off your gas tank Let the fuel dispenser shut off automatically and leave the nozzle in the tank opening for six to eight seconds so the gasoline in the tank neck can settle down and any...

Страница 9: ...here The Maxxum is designed to be compatible with 100 percent gasoline or diesel and 80 percent gasoline with 20 percent methanol ethanol TAME ETBE or MTBE All Models of the Maxxum are UL Listed for t...

Страница 10: ...e discharge head shall be replaced only by identical fasteners READ THIS IMPORTANT SAFETY INFORMATION BEFORE BEGINNING WORK 1 Units should be installed with manholes or with discharge manifold casting...

Страница 11: ...ompany identify and tag the service wires for L 1 L 2 L 3 phase sequence 2 Be certain that the pump with the siphon valve is installed into the correct tank 3 Check the equipment which was received ag...

Страница 12: ...to the manifold discharge port Pipe sealant should be used in this joint Installation of a ball valve is recommended on the discharge side of the pump or discharge of the Big Flo leak detector housin...

Страница 13: ...e to 35 ft lb 50 N m 1 Conduit Conduit from control box Power and thermal overload leads to pump O ring Refer to NOTES Ground wire Ground wire screw Cup washer terminal External toothed washer 1 x 11...

Страница 14: ...e coil voltage and type of pump control d Installations using loading racks only may be connected for 2 or 3 wire control For 3 wire control Figure 4 connect a black wire from terminal 3 in the magnet...

Страница 15: ...agnetic starter to L1 L2 and L3 respectively the motor pump unit will rotate in the correct direction It is recommended however that the performance tests always be made whether or not the power suppl...

Страница 16: ...Installation Wiring the Conduit Box 12 Figure 4 Three Wire Three Phase Motor Wiring Diagram...

Страница 17: ...identified by the symbol for equipotential bonding Refer to Figure 5 for the location underneath the conduit box assembly If required by nationally applicable installation regulations or by conditions...

Страница 18: ...run the submerged pump at least 10 to 20 minutes continuously to purge the air from the siphon manifold 4 After the above checks have been made the backfill can be completed and the manholes installe...

Страница 19: ...D 116 C 96 D 128 C 120 D 152 C 144 D 176 72 51 883 454 1 C 72 D 119 C 84 D 131 C 96 D 143 C 120 D 167 C 144 D 191 Table 3 Winding Resistances Model Number Pump Motor Assembly HP Volt Phase Winding Res...

Страница 20: ...635 997 1552 J 3 380 415 3 5 4 25 0 15 15 787 1250 1956 3070 G 5 208 230 3 17 1 85 0 25 30 240 376 590 920 H 5 380 415 3 8 8 38 0 15 15 472 750 1173 1841 2867 F 5 575 3 7 0 36 0 15 15 929 1477 2311 3...

Страница 21: ...mp check valve housing 2 Install the Big Flo Diaphragm Valve per the instructions included with the Big Flo Diaphragm Valve 3 Install the vent line from the FXV to the 1 4 NPT port in the six inch fla...

Страница 22: ...threads of the 1 4 X 2 inch long nipple with pipe sealant Thread one end of the nipple into the siphon nozzle and the other end into the 1 4 x 3 8 inch reduction bushing 3 Apply pipe sealant to the ma...

Страница 23: ...e 24 on both packers to maximum relief pressure by rotating fully clockwise If maximum pump pressures are NOT a minimum of 5 psi below the Pressurstat relief setting then proper check valves with pres...

Страница 24: ...ibles to operate simultaneously with any combination of dispensers turned on To operate individually the appropriate disconnect switch must be turned off manually See Figure 11 and Figure 12 for sugge...

Страница 25: ...Installation Installing Two Pumps for Tandem Operation 21 Figure 12 Suggested Diagram for Wiring Dual Manifold System Three Wire Control Three Phase...

Страница 26: ...ompletion of the test release the pressure by a Turning the check valve lock down screw counter clockwise as far as it will go b Remove the protective cover from the Pressurstat see Figure 14 and turn...

Страница 27: ...lockwise as far as it will go b Remove the protective cover from the Pressurstat see Figure 14 and turn the Pressurstat adjustment screw counter clockwise until the screw protrudes 3 4 this will relie...

Страница 28: ...sting screw fully down the line relief pressure should be from 40 to 45 psi With the adjusting screw all the way up the pressure should be from 0 to 3 psi 4 The line relief pressure can be verified in...

Страница 29: ...nd remove the four 1 2 inch Extracta retaining bolts Confirm that the lifting eyebolts are properly torqued to 10 ft lbs 13 6 N m with a minimum of 6 full threads installed Occasionally eyebolts are r...

Страница 30: ...head out far enough to see the o ring in the sidewall of its socket Remove the connector s o ring from the connector s socket and discard it Get a 1 234 ID x 0 139 218 P N 072 712 1 wide o ring and l...

Страница 31: ...le and eyebolt should be replaced 3 Utilize BOTH lifting eyebolts to suspend the pump vertically Lower the Extracta into position through the manifold assembly Care should be taken to keep the unit as...

Страница 32: ...air Parts Item Part No Description Number Required 3 HP 5 HP 1 036 043 3 Head Motor Discharge 1 1 2 410774 001 Pigtail Conduit Seal 3 5 HP 1 1 3 072 712 1 Pigtail O ring 1 1 4 072 714 1 Motor Shell O...

Страница 33: ...portions of the vent line and check valve assembly are clean and free of debris or contamination during servicing 1 Relieve system pressure by removing the protective cover and then backing out the p...

Страница 34: ...bris or contamination during servicing 1 Close the ball valve in the discharge line if it has been installed 2 Lock down screw removal see Figure 18 a Remove the four wiper housing retaining screws b...

Страница 35: ...Pressurstat and Check Valve Lock Down Screw Assembly rj 051 301 24 eps Protective cover Adjustment screw Pressurstat body Spring Plunger Diaphragm Lockdown screw 8 Screw Wiper seal Wiper housing O rin...

Страница 36: ...rt No Description Qty 1 076 447 1 Screw Adjustment 1 2 080 944 1 Spring Expansion Relief 1 3 067 278 1 Plunger 1 4 017 573 1 Diaphragm Expansion Relief 1 5 072 642 1 O Ring 112 1 6 072 699 1 O Ring 24...

Страница 37: ...Figure 20 Check Valve and Electrical Bushing Assembly Table 7 Check Valve Electrical Bushing Assembly Repair Parts Item Part No Description Qty 1 144 320 5 Kit Lock Down Screw 1 2 144 317 5 Kit Check...

Страница 38: ...1 Handle Lifting 2 2 026 750 1 Bolt Hex 1 2 13 x 1 1 2 6 3 144 307 5 Kit Siphon Components 1 3a 066 163 3 Plug Siphon Plug 1 4 026 759 1 Bolt Hex 3 4 10 x 1 3 4 3 5 086 010 1 Line Steel Vent 1 6 027 2...

Страница 39: ...ief 1 Table 9 Yoke Assembly Repair Parts Item Part No Description Qty 1 072 700 1 O Ring 223 1 2 072 689 1 Internal Retaining Ring 1 3 144 319 5 Kit 5 Wire Connector Assembly 1 4 072 710 1 O Ring 130...

Страница 40: ...HB 3 37 4 950 137 62 380 415 3 410718 005 UMP P500J17 3K 5 47 0 1200 194 88 380 415 3 410718 004 UMP P500J6 2K 5 41 1 1050 154 70 575 3 UMP WITH DISCHARGE HEAD 410719 001 UMP P300J17 3HB W DH 3 40 1 1...

Страница 41: ...tion of safe use that all installations must provide reliable electrical connection between the pump motor frame pipe manifold or junction box and the tank structure for both electrical protection and...

Страница 42: ...vice when equipment is installed in accordance with the requirement of GB3836 1 2010 GB3836 2 2010 and the connector should be Ex d IIA Ex d IIB IIC grade with 1 NPT thread designed for minimum 5 thre...

Страница 43: ......

Отзывы: