Installation
Wiring the Conduit Box
11
or coded black, orange and red, and if connected through the magnetic starter to L1, L2 and L3 respectively,
the motor pump unit will rotate in the correct direction. It is recommended, however, that the performance
tests always be made whether or not the power supply has been properly “phased out”.
Figure 3. Representative Wiring Diagram, Three-Phase, Two-Wire Control
Содержание Maxxum Big-Flo 6
Страница 16: ...Installation Wiring the Conduit Box 12 Figure 4 Three Wire Three Phase Motor Wiring Diagram...
Страница 43: ......