background image

Wanner Engineering, Inc.

United States 

Instant Information:   www.vectorpump.com

(61) 33-5681   Fax (61) 33-6937                                   VEC-991-400A

Contents

Important Precautions ............................................2

Principles of Operation ...........................................2

Installation Planning ...............................................2

Pump Test and Installation .....................................3

Before Initial Start-Up .............................................3

Maintenance  ..........................................................4

Troubleshooting ......................................................4

Service 

     Models 2002, 2003, 2004, 2005 ....................... 4 

     Models 2006, 2007 ............................................6

Parts List Identification 

     Models 2002, 2003, 2004 .................................7 

     Models 2005, 2006, 2007 .................................8

Principle of Operation

Two rollers, mounted on a rotor, alternately compress a thick-

walled hose in a patented concentric guide. As they rotate, they 

push  the  liquid  in  the  hose  from  the  suction  to  the  discharge 

side. The subsequent opening of the hose, after a roller passes, 

creates a vacuum on the suction side — resulting in continuous 

pumping.

Installation Planning

Inlet Piping

•   Size the inlet line one or two sizes larger than pump suction 

opening.

•  Suction lines should be as short and direct as possible.
•   Size the suction line so that the velocity will not exceed 

1 – 3 ft/sec.

 

  

Velocity  =  0.408 x GPM

 

  

  Pipe I.D.

•   Install a 3 ft. to 4 ft. flexible hose between pump and hard 

piping to absorb vibrations, expansions, or contractions.

•   Install an inlet pressure/vacuum gauge on the inlet side of 

the pump.

•   To reduce turbulence and resistance, do not use 90° elbows. 

If turns are necessary in the suction line use 45° elbows or 

long sweeping elbows when required.

•   Install piping supports where necessary to relieve strain on 

the inlet line and to minimize vibration.

•   In extreme cases, a pulsation dampener may be required to 

decrease acceleration head.

Discharge Piping

•   Size the discharge line to at least the size of the pump inlet 

connection.

•   Between the pump and hard piping, install flexible a hose 

long enough to reduce pulsations (typically 3 ft. to 4 ft.).

•   Install a pressure gauge in the discharge piping.
•  In extreme cases, a pulsation dampener may be required to 

absorb excessive pulsation (caused by high pump speed and 

long discharge lines).

Limited Warranty

Wanner Engineering, Inc. extends to the original purchaser 

of equipment manufactured by it and bearing its name, a 

limited one-year warranty from the date of purchase against 

defects  in  material  or  workmanship,  provided  that  the 

equipment is installed and operated in accordance with the 

recommendations and instructions of Wanner Engineering, 

Inc. Wanner Engineering, Inc. will repair or replace, at its 

option,  defective  parts  without  charge  if  such  parts  are 

returned  with  transportation  charges  prepaid  to  Wanner 

Engineering,  Inc.,  1204  Chestnut  Avenue,  Minneapolis, 

Minnesota  55403.

This warranty does not cover:
1.  The  electric  motors  (if  any),  which  are  covered  by 

the  separate  warranties  of  the  manufacturers  of  these 

components.
2.  Normal  wear  and/or  damage  caused  by  or  related  to 

abrasion,  corrosion,  abuse,  negligence,  accident,  faulty 

installation or tampering in a manner which impairs normal 

operation.
3. Transportation costs.
This  limited  warranty  is  exclusive,  and  is  in  lieu  of  any 

other warranties (express or implied) including warranty of 

merchantability or warranty of fitness for a particular purpose 

and  of  any  noncontractual  liabilities  including  product 

liabilities based on negligence or strict liability. Every form 

of  liability  for  direct,  special,  incidental  or  consequential 

damages or loss is expressly excluded and denied.

Vector Series Installation

! CAUTION

        Important Precautions

• To avoid personal injury or pump damage, follow all

instructions and safety precautions carefully.

• Don’t exceed the manufacturer’s recommended RPM

or pressure limits.

• Follow all codes and hydraulic recommendations on

installation and operation of the pumping system.

• To prevent vibration, mount the pump and motor securely

to a rigid, level base.

• For safety and easier servicing, provide adequate work

space around the pump. Allow space to remove the front

cover, hose clamps, hose, and drive unit.

W0387

Содержание 2003

Страница 1: ...s MN 55403 TEL 612 332 5681 FAX 612 332 6937 TOLL FREE FAX US only 800 332 6812 www vectorpump com email sales wannereng com W0453 Installation and Operation Manual VEC 991 2400A Vector 2000 Series Mo...

Страница 2: ...ses a pulsation dampener may be required to absorb excessive pulsation caused by high pump speed and long discharge lines Limited Warranty Wanner Engineering Inc extends to the original purchaser of e...

Страница 3: ...Pharmed name on hose Fiber Braided Hypalon HF Black color yellow stripe double braided EPDM EF Black color white stripe double braided Natural Rubber NF Black color green stripe double braided standar...

Страница 4: ...ot be adjusted with equal pressure on the hose See Figure 3 If the hose fails in area A this may occur from operating the pump at a discharge pressure higher than the hose is rated for or with a close...

Страница 5: ...steps 2 thru 6 Service Models 2002 2003 2004 2005 Setting Roller Pressure Note This pressure setting must be checked when a new hose is installed because of variations in hose thickness 1 Remove front...

Страница 6: ...oosen clamp bolts Remove hose supports and clamps that secure both ends of hose 6 Remove hose from pump casing 7 Pull cut hose if needed hose connectors from worn hose Clean if reusable 8 Carefully cl...

Страница 7: ...Casing 1 2 Cover front 1 3 Window cover 1 4 Bracket mounting 1 5 Roller assembly 1 6 Clamp hose 2 7 Screw cover 1 or 2 8 Hose 1 9 Key motor non shown 2 10 Screw roller 1 Ref Qty per No Description Pu...

Страница 8: ...he same style of roller assembly as Models 2002 2004 see previous page Ref Qty per No Description Pump 1 Casing 1 2 Cover front 1 3 Window cover 1 5 Roller assembly 1 6 Clamp hose 4 7 Screw cover 2 or...

Отзывы: